Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134E769 + (ML20134E769)
- ML20134E771 + (ML20134E771)
- 05000219/LER-1997-001, :on 970103,seven Penetrations in Five Sys Did Not Meet Requirements as Described in GL 96-06.Caused by Previous Analyses Were Performed Without Using Conservation Assumptions.Determination Was Performed + (ML20134E772)
- ML20134E773 + (ML20134E773)
- ML20134E775 + (ML20134E775)
- ML20134E776 + (ML20134E776)
- NRC-96-4862, Forwards Responses to NRC Dser Section 3.12 Open Items + (ML20134E777)
- ML20134E778 + (ML20134E778)
- ML20134E779 + (ML20134E779)
- ML20134E780 + (ML20134E780)
- ML20134E781 + (ML20134E781)
- ML20134E782 + (ML20134E782)
- ML20134E783 + (ML20134E783)
- ML20134E784 + (ML20134E784)
- ML20134E785 + (ML20134E785)
- ML20134E786 + (ML20134E786)
- PY-CEI-NRR-2105, Responds to NRC 960905 RAI Re Thermo-Lag Ampacity Derating Issues + (ML20134E787)
- 05000352/LER-1996-018-01, Forwards LER 96-018-01 Which Discusses Event That Occurred on 960925 Re Inoperability of HPCI Sys Due to Loss of HPCI Turbine Speed Signal Caused by Loose Speed Sensor Connector + (ML20134E788)
- ML20134E789 + (ML20134E789)
- ML20134E790 + (ML20134E790)
- ML20134E791 + (ML20134E791)
- ML20134E792 + (ML20134E792)
- ML20134E793 + (ML20134E793)
- ML20134E794 + (ML20134E794)
- ML20134E795 + (ML20134E795)
- ML20134E796 + (ML20134E796)
- 05000352/LER-1996-018, :on 960925,single Train HPCI Sys Was Declared Inoperable Due to Loose Signal Cable Connector.Connector Was Replaced on 970102 & Common HPCI Turbine Maint Procedures Have Been Revised + (ML20134E797)
- ML20134E798 + (ML20134E798)
- ML20134E799 + (ML20134E799)
- ML20134E800 + (ML20134E800)
- ML20134E802 + (ML20134E802)
- ML20134E803 + (ML20134E803)
- IR 05000620/2007024 + (ML20134E806)
- ML20134E807 + (ML20134E807)
- ML20134E808 + (ML20134E808)
- ML20134E810 + (ML20134E810)
- ML20134E811 + (ML20134E811)
- ML20134E812 + (ML20134E812)
- ML20134E813 + (ML20134E813)
- ML20134E814 + (ML20134E814)
- IR 05000373/1985019 + (ML20134E815)
- ML20134E816 + (ML20134E816)
- ML20134E817 + (ML20134E817)
- ML20134E818 + (ML20134E818)
- ML20134E819 + (ML20134E819)
- ML20134E820 + (ML20134E820)
- 05000413/LER-1996-014, :on 961230,solid State Protection Sys Train B Relay K616 Properly Actuated,Failed to Latch in Tripped Position During Periodic Main Steam Line Isolation Testing. Caused by Equipment failure.K616 Replaced + (ML20134E821)
- ML20134E823 + (ML20134E823)
- 05000409/LER-1997-001, :on 970102,1A EDG Trouble Annunciator Alarmed Due to High Coolant Temperature of 205 Degrees F.All PMs Associated W/Sys That Require Second Verification Will Be Reviewed & Revised as Necessary + (ML20134E824)
- ML20134E826 + (ML20134E826)
- ML20134E829 + (ML20134E829)