Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134D700 + (ML20134D700)
- ML20134D701 + (ML20134D701)
- ML20134D702 + (ML20134D702)
- ML20134D705 + (ML20134D705)
- ML20134D706 + (ML20134D706)
- ML20134D707 + (ML20134D707)
- IR 05000285/1985008 + (ML20134D710)
- ML20134D712 + (ML20134D712)
- ML20134D713 + (ML20134D713)
- ML20134D714 + (ML20134D714)
- ML20134D716 + (ML20134D716)
- ML20134D717 + (ML20134D717)
- ML20134D719 + (ML20134D719)
- L-96-081, Apologizes for Not Providing IT Corp W/Copy of 960823 Correspondence W/G Yuhas + (ML20134D720)
- ML20134D721 + (ML20134D721)
- ML20134D722 + (ML20134D722)
- ML20134D725 + (ML20134D725)
- 05000271/LER-1996-014, :on 960604,FSAR Requirements for Venting Capability of DG Rooms in Event of Tornado Were Not Being Met.Caused by Failure to Implement Plant Construction/ Configuration Change.Mods Installed + (ML20134D726)
- ML20134D727 + (ML20134D727)
- 05000155/LER-1996-011-01, :on 960926,TS Surveillance Requirement Inadvertently Surpassed.Caused by Inadequate Procedure. Start-up Procedure 0-TGS-1, Master Checklist Immediately Revised + (ML20134D729)
- ML20134D730 + (ML20134D730)
- ML20134D731 + (ML20134D731)
- ML20134D732 + (ML20134D732)
- ML20134D733 + (ML20134D733)
- ML20134D735 + (ML20134D735)
- ML20134D736 + (ML20134D736)
- ML20134D737 + (ML20134D737)
- BVY-96-130, Submits App R Fire Area Matrix,Specifying Station Shutdown Methods,Capabilities & Compensatory Actions for pre-outage + (ML20134D738)
- PNO-V-85-052, on 850805 & 08,breaker Power Switches on Control Element Drive Mechanism Panels Found Closed.Two 13.8 Kv Electrical Breaker Incidents Under Licensee Review to Determine If Tampering Involved + (ML20134D739)
- ML20134D740 + (ML20134D740)
- 05000213/LER-1996-023, :on 960814,containment Air Recirculation Fans Did Not Meet TS Requirement for Air Flow Rates of 52,500 +/- 2,500 Cfm.Caused by Test Method Variability.Proposed TS Change Request Was Submitted + (ML20134D741)
- ML20134D742 + (ML20134D742)
- IA-85-464, Agenda for 850522 Meeting W/Hydrogen Control Owners Group (Hcog) to Review Programmatic Goals & Philosophy of Hcog & Recent NRC-HCOG Interactions on Program Plan Tasks & Evaluate NRC-HCOG Interactions + (ML20134D742)
- ML20134D743 + (ML20134D743)
- ML20134D744 + (ML20134D744)
- ML20134D745 + (ML20134D745)
- ML20134D746 + (ML20134D746)
- ML20134D747 + (ML20134D747)
- ML20134D749 + (ML20134D749)
- ML20134D752 + (ML20134D752)
- 05000354/LER-1996-030, Submits List of Commitments Re Unplanned HPCI Sys Inoperability Due to Stuck Open Extended Containment Boundary Valve in LER 96-030-00 + (ML20134D754)
- ML20134D755 + (ML20134D755)
- ML20134D756 + (ML20134D756)
- 05000213/LER-1996-020, :on 960709,found Fuel Transfer Tube Bellows Not Included on 10CFR50,App J Test Program.Caused by Administrative Oversight.Bellows Will Be Added to Test Program + (ML20134D757)
- ML20134D759 + (ML20134D759)
- PNO-II-96-074, on 961027,female Employee Exposed to 1,000 Rem to Hands at Gilman Paper Co Facility in St Marys,Ga.Svc Person Unaware,Gauge Shutter Physically Wired Open.Radiation Surveys Not Performed.No Media Interest Expected at Time + (ML20134D760)
- ML20134D761 + (ML20134D761)
- ML20134D762 + (ML20134D762)
- ML20134D763 + (ML20134D763)
- ML20134D764 + (ML20134D764)
- TXX-9647, Confirms Regulatory Commitments Re Unit 2 SI Sys Header Pressurization,Per Insp Repts 50-445/96-10 & 50-446/96-10 + (ML20134D765)