Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- HL-5189, Forwards Request for Addl Info Re Generic Letter 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves + (ML20113A720)
- 05000370/LER-1996-004-02, :on 960524,Emergency Diesel Generator 2A Automatically Started.Caused by Lightning Strike.Personnel Dispatched to Check Alarms & Restarted Tripped Equipment.W/ + (ML20113A730)
- NSD-NRC-96-4749, Forwards Draft SSAR Section 18.5 AP600 Task Analysis Activities.Section Revised to Provide Resolution to Dser Open Items 18.5.3-1 & 18.5.3-2 + (ML20113A733)
- NSD-NRC-96-4752, Forwards Westinghouse Responses to Open Items on AP600. Responses to Oits Items 2310 Through 2319 & Oits Items Through Oits 2330 Included Also + (ML20113A736)
- AECM-85-0014, Forwards Addl Info,Requested in ,Re Concerns Involving Transfer of Control to Remote Shutdown Panel Resulting in Change in Operating Status of Load That May Be Detrimental to Safe Shutdown + (ML20113A740)
- 05000528/LER-1985-014, :on 850302,cross Trips of Train B balance-of-plant ESF Actuation Sys Occurred.Caused by Dc Backup Power Supply in Train a Being Out of Svc.Procedure Change Notice Developed + (ML20113A749)
- RC-96-0158, Follow-up to Request for Addl Info Re GL 92-08 for Ampacity Derating Issue + (ML20113A769)
- ML20113A776 + (ML20113A776)
- ML20113A779 + (ML20113A779)
- ML20113A782 + (ML20113A782)
- ML20113A786 + (ML20113A786)
- ML20113A793 + (ML20113A793)
- ML20113A799 + (ML20113A799)
- ML20113A805 + (ML20113A805)
- ML20113A809 + (ML20113A809)
- ML20113A810 + (ML20113A810)
- ML20113A811 + (ML20113A811)
- ML20113A814 + (ML20113A814)
- ML20113A835 + (ML20113A835)
- ML20113A836 + (ML20113A836)
- ML20113A845 + (ML20113A845)
- ML20113A850 + (ML20113A850)
- ML20113A852 + (ML20113A852)
- ML20113A858 + (ML20113A858)
- ML20113A864 + (ML20113A864)
- L-84-326, Responds to NRC Re Violations Noted in Insp Rept 50-389/83-57.Corrective Actions:Formal Interpretation of Sprinkler Design Re Obstructions Requested from NFPA + (ML20113A866)
- ML20113A871 + (ML20113A871)
- ML20113A877 + (ML20113A877)
- ML20113A878 + (ML20113A878)
- U-602591, Proposed Tech Specs,Allowing Utilization of RWP or Equivalent to Control Entry Into High Radiation Area, Clarifying Example Given in TS of Individuals Qualified in Radiation Protection Procedures + (ML20113A887)
- 05000338/LER-1984-024, :on 841206,five Periodic Tests (PT) Not Performed within Required Surveillance Intervals.Caused by Breakdown in Communications Between Depts.Enhancements to PT Tracking Sys Being Developed + (ML20113A893)
- ML20113A904 + (ML20113A904)
- U-602599, Special Rept:On 960516,Loose Parts Monitoring System Declared Inoperable.Caused by Intermittent Alarms.Removed Temporary Mod & Restored Alarm Feature for Channel Three + (ML20113A916)
- 3F0696-01, Provides 1995 Actual & 1996 Projected Internal Cash Flow Projection for Crystal River Unit 3 Nuclear Power Station + (ML20113A927)
- ML20113A966 + (ML20113A966)
- BSEP-96-0209, Submits Owner Data Rept for ISI Activities Conducted at BSEP During Refueling Outage 11 + (ML20113A973)
- ML20113A977 + (ML20113A977)
- ML20113A981 + (ML20113A981)
- ML20113A988 + (ML20113A988)
- ML20113A989 + (ML20113A989)
- ML20113B018 + (ML20113B018)
- 2CAN069603, 1995 ANO Unit 2 10CFR50.59 Rept, for Period Ending 951120 + (ML20113B038)
- ML20113B053 + (ML20113B053)
- 0CAN069602, Forwards Response to Violations Noted in Insp Repts 50-313/96-02 & 50-368/96-02.Corrective Actions:Valve Chain Reconfigured & Locked to Preclude Valve Operation + (ML20113B060)
- 05000333/LER-1996-007-01, :on 960522,sys Isolations & Standby Gas Treatment Initiation Occurred.Caused by False High Radiation Trip Signal.Detector Replaced W/Vendor Current Model + (ML20113B061)
- 05000318/LER-1996-002-01, :on 960522,fire Watch Missed.Caused by Personnel Error.Counseled Personnel Re Event + (ML20113B062)
- 05000313/LER-1996-005-02, :on 960519,automatic Reactor Trip on High RCS Pressure Occurred.Caused by Component Failure in a MFW Pump Control Sys.Failed Speed Sensor Replaced + (ML20113B063)
- 05000293/LER-1996-007, :on 960519,LCO for Operation for Switchyard Battery Exceeded Tech Spec.Caused by Personnel Error.Revised Procedure 8.9.8.4 & Revised Master Surveillance Tracking Program Nodes + (ML20113B082)
- L-84-353, Responds to NRC Re Violations Noted in Insp Repts 50-250/84-25 & 50-251/84-26.Corrective Actions:New Training Video Tape Prepared to Address Requirements of Administrative Procedure 0306 + (ML20113B085)
- BSEP-96-0225, Forwards Response to NRC GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (ML20113B086)
- ML20113B089 + (ML20113B089)