Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083P377 + (ML20083P377)
- ML20083P381 + (ML20083P381)
- ML20083P389 + (ML20083P389)
- ML20083P390 + (ML20083P390)
- ML20083P391 + (ML20083P391)
- BECO-83-214, Submits Addl Info Re Insp of BWR Stainless Steel Piping,Per 830808 Meeting.Issue Will Be Resolved as Expeditiously as Is Consistent W/Public Safety.Related Info Encl + (ML20083P401)
- 05000446/LER-1994-022-01, Forwards LER 94-022-01 Re Labeling Error Leading to Inoperability of Power Range Instrumentation + (ML20083P404)
- 05000366/LER-1981-127, Forwards Updated LER 81-127/03X-1 + (ML20083P408)
- 05000269/LER-1983-001-01, /01T-0:on 830111,evaluation Determined That Single Failure in Keowee Hydro Woodward Governor Sys Could Prevent Automatic Actuation of Emergency Power.Caused by Design Deficiency in Switching Logic.Operators Informed + (ML20083P414)
- 05000280/LER-1984-006-01, :on 840301,as Result of Snubber Functional tests,69 of 226 Snubbers Failed to Meet Acceptance Criteria. Cause Not Stated.Snubber Program Revised & Associated Procedures Reviewed + (ML20083P420)
- 05000250/LER-1984-010, :on 840417,mods Necessitated Number of Fire Barriers to Be Breached.Hourly Fire Watch Established. Penetrations in Fire Area Boundary Will Be Sealed Per App R Commitments + (ML20083P430)
- 05000366/LER-1981-127-03, During Normal Surveillance of Diesel Generator 2C,engine Failed & Declared Inoperable.Caused by Rod Separating from Crankshaft Due to Loss of One of Two Retaining Bolts.Engine Repaired + (ML20083P443)
- 2CAN059508, Application for Amend to License NPF-6,adding Defined Special Interest Groups for SG Tube Insps + (ML20083P449)
- ML20083P462 + (ML20083P462)
- ML20083P464 + (ML20083P464)
- ML20083P465 + (ML20083P465)
- ML20083P466 + (ML20083P466)
- ML20083P467 + (ML20083P467)
- ML20083P468 + (ML20083P468)
- ML20083P469 + (ML20083P469)
- ML20083P470 + (ML20083P470)
- ML20083P474 + (ML20083P474)
- B15216, Provides Suppl to 941214 Request for Rev to TSs Re SR for Leak Collection & Release Sys & Overall Containment Integrated Leakage Rate + (ML20083P480)
- ML20083P481 + (ML20083P481)
- NRC-95-4449, Forwards Nonproprietary & Proprietary Presentation Matls Used During 950427 Meeting W/Nrc in Rockville,Md Re AP600 in-vessel Retention Severe Accident Topics.Proprietary Presentation Matls Withheld Per 10CFR2.790 + (ML20083P484)
- ML20083P486 + (ML20083P486)
- 0CAN059503, Application for Amends to Licenses DPR-51 & NPF-6,revising Reactor Containment Bldg Closure Requirements During Fuel Movement & Core Alterations + (ML20083P487)
- ML20083P491 + (ML20083P491)
- B15182, Provides Updated Response Dates to Certain NRC Open Items on Plant Unit 2 Electrical Distribution Sys Functional Insp Re Insp Rept 50-336/93-81.Revised Schedule Encl + (ML20083P496)
- ML20083P498 + (ML20083P498)
- ML20083P499 + (ML20083P499)
- ML20083P500 + (ML20083P500)
- ML20083P501 + (ML20083P501)
- ML20083P502 + (ML20083P502)
- B15212, Provides Update to Info Northeast Nuclear Energy Co Submitted to NRC in Response to GL 89-13 on Behalf of Plant Unit 3 + (ML20083P511)
- 05000275/LER-1984-008, :on 840315,inadvertent Safety Injection Actuation Experienced.Caused by Failure of Technician to Follow Procedure While Performing Surveillance Test on Train A.Technician Counseled + (ML20083P517)
- ML20083P519 + (ML20083P519)
- ML20083P520 + (ML20083P520)
- ML20083P525 + (ML20083P525)
- ML20083P527 + (ML20083P527)
- ML20083P532 + (ML20083P532)
- 05000366/LER-1979-088, Forwards Updated LER 79-088/03X-1 + (ML20083P533)
- ML20083P534 + (ML20083P534)
- ML20083P535 + (ML20083P535)
- 05000296/LER-1982-068, Forwards LER 82-068/03L-0 + (ML20083P538)
- 2CAN128218, Provides Info to Satisfy Requirements of IE Bulletin 82-02, Degradation of Threaded Fasteners in RCPB of PWR Plants, Action Item 4.No Indication of stress-corrosion Cracking Found + (ML20083P544)
- SNRC-2192, Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank + (ML20083P545)
- ML20083P546 + (ML20083P546)
- 05000366/LER-1979-088-03, Surveillance Procedure HNP-2-3353E Not Completed Due to Failure of Charcoal Filter Deluge Sys to Operate Automatically.Caused by Water Pressure Fluctuations.Water Supplies Changed + (ML20083P554)
- ML20083P555 + (ML20083P555)
- ML20083P561 + (ML20083P561)