Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20059B819 + (ML20059B819)
- ML20059B820 + (ML20059B820)
- ML20059B821 + (ML20059B821)
- JSP-676-90, Responds to 900725 Notice of Violation & Proposed Imposition of Civil Penalty Documented in Insp Rept 50-461/90-09. Corrective Action:Critique Initiated to Identify Precise Causes & Contributing Factors Leading to Event + (ML20059B822)
- ML20059B823 + (ML20059B823)
- ML20059B825 + (ML20059B825)
- ML20059B827 + (ML20059B827)
- ML20059B828 + (ML20059B828)
- ML20059B830 + (ML20059B830)
- ML20059B832 + (ML20059B832)
- ML20059B834 + (ML20059B834)
- ML20059B836 + (ML20059B836)
- ML20059B838 + (ML20059B838)
- IR 05000346/1993016 + (ML20059B839)
- ML20059B841 + (ML20059B841)
- ML20059B843 + (ML20059B843)
- ML20059B844 + (ML20059B844)
- ML20059B846 + (ML20059B846)
- 05000285/LER-1993-012, :on 930923,identified Condition Involving Five MOVs Having Cables That Were Inadequately Sized Due to Lack of Attention to Detail in Design Package Preparation for 1990 Mod.Thermal Overloads Enabled + (ML20059B847)
- ML20059B851 + (ML20059B851)
- ML20059B852 + (ML20059B852)
- ML20059B855 + (ML20059B855)
- ML20059B856 + (ML20059B856)
- ML20059B859 + (ML20059B859)
- IR 05000413/1993029 + (ML20059B860)
- ML20059B862 + (ML20059B862)
- ML20059B863 + (ML20059B863)
- ML20059B866 + (ML20059B866)
- ML20059B867 + (ML20059B867)
- ML20059B868 + (ML20059B868)
- ML20059B869 + (ML20059B869)
- PY-CEI-NRR-1713, Responds to NRC Re Violations Noted in Insp Rept 50-440/93-17.C/As:licensee Will Perform Evaluation to Analyze Historical Data for Both Annulus Exhaust Gas Treatment & CR Emergency Recirculation Sys + (ML20059B870)
- IR 05000348/1993028 + (ML20059B871)
- ML20059B872 + (ML20059B872)
- ML20059B875 + (ML20059B875)
- B14651, Responds to NRC Re 930603 Response to NOV & Demand for Info,W/Regard to Validation of Enhancements to Nuclear Safety Concern Program & Nuclear Group Training Programs + (ML20059B878)
- ML20059B882 + (ML20059B882)
- ML20059B885 + (ML20059B885)
- ML20059B886 + (ML20059B886)
- ML20059B887 + (ML20059B887)
- 05000324/LER-1990-007-03, :on 900724,unit HPCI Sys Received Three Isolations of Outboard Valve.Caused by Loose Wire Landing on Terminal of Temp Module.Loose Wire Tightened.Request Made to Have Engineering Evaluate Adequacy of Design + (ML20059B888)
- ET-NRC-93-4000, Forwards Westinghouse Responses to NRC Request for Addl Info on AP600 from + (ML20059B889)
- 05000325/LER-1990-013-01, :on 900725,containment Atmospheric Control & Containment Atmospheric Dilution Subsystem Design Does Not Meet FSAR Commitments & Design Requirements.Seven Day Tracking Condition for Operator Established + (ML20059B890)
- ML20059B891 + (ML20059B891)
- ML20059B892 + (ML20059B892)
- ML20059B896 + (ML20059B896)
- ML20059B897 + (ML20059B897)
- ML20059B899 + (ML20059B899)
- IR 05000483/1993012 + (ML20059B900)
- ML20059B901 + (ML20059B901)
- ML20059B902 + (ML20059B902)