Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20035C080 + (ML20035C080)
- ML20035C083 + (ML20035C083)
- ML20035C084 + (ML20035C084)
- ML20035C087 + (ML20035C087)
- ML20035C088 + (ML20035C088)
- ML20035C091 + (ML20035C091)
- ML20035C093 + (ML20035C093)
- ML20035C096 + (ML20035C096)
- ML20035C097 + (ML20035C097)
- ML20035C098 + (ML20035C098)
- ML20035C099 + (ML20035C099)
- ML20035C100 + (ML20035C100)
- ML20035C101 + (ML20035C101)
- ML20035C111 + (ML20035C111)
- ML20035C112 + (ML20035C112)
- ML20035C115 + (ML20035C115)
- ML20035C116 + (ML20035C116)
- ML20035C119 + (ML20035C119)
- 05000265/LER-1993-007-02, :on 930307,determined That B Loop Main Steam Isolation Valves Exceeded TS Leakage Limits for Containment Isolation Valves.Cause Cannot Be Determined.Suppl Rept Will Be Issued When Repairs Completed + (ML20035C121)
- ML20035C122 + (ML20035C122)
- ML20035C123 + (ML20035C123)
- IR 05000413/1993008 + (ML20035C127)
- RC-93-0080, Raises Questions Re Charges Related to Invoice XM0200-93,as Followup to 930308 Inquiry.Charges Cover Part 55 Svcs for Operator License Exams Completed on 920523 + (ML20035C128)
- ML20035C131 + (ML20035C131)
- PNO-III-93-019, on 930326,ROs Manually Scrammed Reactor Because of Break in 30-inch Fiber Glass,Underground Svc Water Line Outside Plant,Which Caused Flooding.Broken Line Was Isolated by Shutting Off Svc Water Pumps + (ML20035C132)
- ML20035C135 + (ML20035C135)
- ML20035C138 + (ML20035C138)
- ML20035C139 + (ML20035C139)
- 05000254/LER-1992-023, :on 920920 & 1211,determined That Heat Transfer Capability of RHR HX 1B Did Not Meet Design Requirements. Caused by Fouling & Silt Accumulation on RHR Svc Water Side of Hx.Heat Flushing Procedure Initiated + (ML20035C143)
- ML20035C144 + (ML20035C144)
- ML20035C145 + (ML20035C145)
- ML20035C148 + (ML20035C148)
- 05000412/LER-1993-004-01, :on 930302,130-volt Ground on Dc Bus 2-1 Experienced,Resulting in SG Blowdown Isolation.Caused by Personnel Error.Esf Actuation Warning Placards Placed on Breaker 8-1 & Supervisors Counseled + (ML20035C150)
- ML20035C151 + (ML20035C151)
- ML20035C153 + (ML20035C153)
- 05000313/LER-1993-001-01, :on 930305,experienced Reactor Trip Initiated by ARTS as Result of Main Turbine Trip.Caused by Occurrence of Two Grounds on 125 Vdc Bus D-1.Wiring Application at Main Circuits Will Be Evaluated for Damage + (ML20035C154)
- ML20035C155 + (ML20035C155)
- ML20035C156 + (ML20035C156)
- ML20035C159 + (ML20035C159)
- ML20035C160 + (ML20035C160)
- ML20035C161 + (ML20035C161)
- ML20035C164 + (ML20035C164)
- ML20035C165 + (ML20035C165)
- 05000413/LER-1993-005, :on 930301,NRC Resident Inspector Discovered Ssps Wiring Errors Due to Mfg Fabrication Deficiency.Work Request 93017239-01 Initiated & Mfg Distributed Info Notice Addressing Wiring Problems + (ML20035C166)
- ML20035C167 + (ML20035C167)
- 05000254/LER-1993-002-09, :on 930302,determined That Differential Pressure of 0.10 Inches Water Vacuum Could Be Obtained Instead of TS Required Pressure of 0.25 Inches Water Vacuum. Caused by Testing Defect.Procedure Changed + (ML20035C168)
- ML20035C169 + (ML20035C169)
- ML20035C170 + (ML20035C170)
- ML20035C172 + (ML20035C172)
- ML20035C174 + (ML20035C174)
- ML20035C177 + (ML20035C177)