Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20005E357 + (ML20005E357)
- ML20005E359 + (ML20005E359)
- ML20005E360 + (ML20005E360)
- ML20005E361 + (ML20005E361)
- ML20005E362 + (ML20005E362)
- IR 05000346/1989021 + (ML20005E363)
- ML20005E364 + (ML20005E364)
- ML20005E365 + (ML20005E365)
- ML20005E366 + (ML20005E366)
- ML20005E367 + (ML20005E367)
- ML20005E368 + (ML20005E368)
- 3F1289-18, Responds to Violations Noted in Insp Rept 50-302/89-24. Corrective Actions:Timing Sequences & Duration of Major Loads on Trains a & B Revalidated + (ML20005E369)
- ML20005E370 + (ML20005E370)
- ML20005E371 + (ML20005E371)
- ML20005E374 + (ML20005E374)
- ML20005E375 + (ML20005E375)
- ELV-01169, Certifies That fitness-for-duty Program Implemented Per 10CFR26.Testing Panel & cut-off Levels in Program Encl + (ML20005E377)
- ML20005E378 + (ML20005E378)
- ML20005E379 + (ML20005E379)
- ML20005E380 + (ML20005E380)
- ML20005E381 + (ML20005E381)
- ML20005E385 + (ML20005E385)
- ML20005E386 + (ML20005E386)
- ML20005E388 + (ML20005E388)
- ML20005E389 + (ML20005E389)
- ML20005E390 + (ML20005E390)
- 05000277/LER-1989-030-01, :0n 891126,steam Leak Discovered Coming from Packing on RCIC Injection Check Valve AO-22.Caused by Failure of Valve Stem Packing.Normal Reactor Level Restored & Mods of Valve Will Be Pursued + (ML20005E391)
- ML20005E392 + (ML20005E392)
- ML20005E393 + (ML20005E393)
- ML20005E394 + (ML20005E394)
- ML20005E396 + (ML20005E396)
- 05000317/LER-1989-019, :on 891128,discovered That HPSI Discharge Header Isolation Valves Not Locked Shut When RCS in Water Solid Condition,Resulting in Operation Outside Design Basis. Procedure Revised to Require Valves Closed + (ML20005E397)
- ML20005E398 + (ML20005E398)
- ML20005E399 + (ML20005E399)
- ML20005E401 + (ML20005E401)
- 05000413/LER-1989-028, :on 891204,steam Generator 1D Power Operated Relief Valve Did Not Close on Train a Main Steam Isolation Signal During Valve Inservice Test.Caused by Failed Fuse. Fuse Replaced + (ML20005E402)
- ML20005E403 + (ML20005E403)
- ML20005E404 + (ML20005E404)
- ML20005E405 + (ML20005E405)
- ML20005E406 + (ML20005E406)
- LD-89-133, Forwards Licensee Nov 1989 License Compliance Status Rept Update.Rept Includes Updated Completion Status of Activities Depicted in 890330 Submittal & Summarized Status of Items Obtained from Independent Task Force Review of Operations + (ML20005E407)
- ML20005E408 + (ML20005E408)
- ML20005E409 + (ML20005E409)
- IR 05000338/1989031 + (ML20005E411)
- ML20005E412 + (ML20005E412)
- ML20005E414 + (ML20005E414)
- ML20005E415 + (ML20005E415)
- ML20005E417 + (ML20005E417)
- ML20005E418 + (ML20005E418)
- ML20005E419 + (ML20005E419)
- ML20005E420 + (ML20005E420)