ML20005E399

From kanterella
Jump to navigation Jump to search

Forwards Corrected Amends 90 & 83 to Licenses DPR-42 & DPR-60,respectively.Amends Change Tech Specs by Permitting Irradiation of Fuel Assemblies W/Enrichment Up to 4.25 Weight % U-235 & Storage of Assemblies Prior to Loading
ML20005E399
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 12/21/1989
From: Diianni D
Office of Nuclear Reactor Regulation
To: Parker T
NORTHERN STATES POWER CO.
Shared Package
ML20005E400 List:
References
TAC-72972, TAC-72973, NUDOCS 9001050178
Download: ML20005E399 (3)


Text

'

December 21$ 1989 DISTR; BUTION g Docket Hos. 50-282; C uus,w - HLE "

ARM /LFMB and 50-306 NRC & LOCAL PDRs ACRS(10)

PD31 GRAY FILE PSHUTTLEWORTH Mr. T. M. Parker, Manager JZWOLINSKI GHILL(8)

Nuclear Support Services PSHEA GPA/PA Northern States Power Company DDIIANNI OGC 414 Nicollet Mall EJORDAN WANDA JONES Minneapolis, Minnesota 55401 EBUTCHER

Dear Mr.- Parker:

SUBJECT:

CORRECTION TO AMENDMENT N05. 90 AND 83 TO FACILITY OPERATING LICENSE NOS. DPR-42 AND DPR-60 (TAC NOS. 72972 AND 72973)

On August 28, 1989, the Commission issued Amendment Hus. 90 and 83 to facility Operating License-Nos. DPR-42 and DPR-60 for the Prairie Island Nuclear-Generating Plant, Unit Nos. 1 and 2.

The amendments consisted of changes to the Technical Specification (TS) by permitting the irradiation of the fuel assemblies with enrichment up to 4.25 weight percent (w/o) Uranium-235 and the storage of such assemblies prior to and subsequent to loading the assemblies in the reactors.

'The following TS pages had typographical and/or editorial errors:

TS.3.8-3', Section 3.8E.1(b) stated "...three storage locations of every i

four by four storage rack array." The statement should read "...three storage locations of every two by two storage rack array.

-TS.5.3-1, Section 5.3A.1, line 2 should read "... enriched uranium dioxide pellets. The pellets are encapsulated...."

j The Reference appearing on TS page TS 5.6-3 should have a vertical line

-. indicating the area of change.

,The correctediTS pages are enclosed. Please accept our apology for any inconvenience these errors may have caused you.

Sincerely, g

NdM13!QGLUq Dominic C. Dilanni. Project Manager Project Directorate III-1 9001030178 891221 Division of Reactor Projects - III, PDR ADOCK 05000282 IV, V & Special Projects 1

p PDC Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

S e next page qgf V

CORRECTION LETTER h A/PD31:DRSP PM/PD31:DRSP 31:DRSP

\\ PSHEA DDIIANNI J

12/p989 12/ g 9 12/PS89

/

m

?~

.) g EDCtc't m rg..s UNITED STATES t! 7 [*

( p,}

NUCLEAR REGULATORY COMMISSION

- 3

.e; wAssinoToN, D C.20555 o,

f December 21. 1989 1

Docket Nos. 50-282 and 50-306~

L Mr. T. M. Parker, Manager Nuclear _ Support Services Northern States Power Company 414 Nicollet Mail-Minneapolis, Minnesota: 55401

Dear Mr. Parker:

SUBJECT:

CORRECTION TO AMENDMENT NOS. 90 AND 83 TO FACILITY OPERATING LICENSE NOS. DPR-42'AND DPR-60 (TAC NOS. 72972 AND 72973) p On August 28, 1989, the Comission issued Amendment Nos. 90 and 83 to facility Operating License Nos. DPR-42 and DPR-60 for the Prairie Island Nuclear I

Cenerating' Plant, Unit Nos. I and 2.

The amendments consisted'of changes to i

the Technical' Specification (TS) by permitting the irradiation of the fuel q

assemblieswithenrichmentupto4.25weightpercent(w/o) Uranium-235and'the storage of such assemblies prior to and subsequent to loading tFe assemblies in the reactors.

The following TS pages had typographical and/or editorial errors:

TS.3.8-3, Section 3.8E.1(b).' stated ...three storage locations of every four by :four storage. rack array." The statement should' read "...three storage locations of every two by two storage rack array.

i TS.5.3-1, Section 5.3A.1, line 2 should read "... enriched uranium dioxide-i pellets. The pellets are encapsulated...."

The Reference appearing en TS page TS 5~6-3 should have'-a vertical line indicating the area of change.

The corrected TS pages are enclosed. Please accept our apology for any inconvenience these errors may have caused you.

Sincerely,

[

L 0

Dominic C. Dilanni, Project Manager Project Directorate 111-1 Division of Reactor Projects - III, IV, V & Special Projects 1

Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page

~~

~

^

^

^

^ ~

y, c f*

9;.

Mr.'T. M. Parker Prairie Island Nuclear Generating l

Northern States Power Company-Plant-

't-Gera_1d Charnoff, Esq..

Shaw, Pittman, Potts and Trowbridge-

.2300 N Street.:N.W.

> Washington, DC.20037

-Dr. J.--W. Ferman-

-Minnesota Pollution. Control Agency-520 Lafayette-Road St. Paul, MN -55155-Mr.. E.: L. Watzl. Plant Manager Prairie Island Nuclear Generating Plant-Northern States Power Company Route 2'

' Welch, Minnesota-55089 Joseph G. Maternowski-Assistant Attorney General Environmental: Protection Division Suite.200 520. Lafayette Road St.-. Paul,' Minnesota -55155 4

U.S.JNuclear Regulatory Commission

. Resident Inspector's: Office 1719 Wakonade Drive East Welch, Minnesota 55089:

Regional Administrator, Region III U.S. Nuclear Regulatory Commission Office-of Executive Director'for Operations i

799 Rcosevelt Road l

' Glen Ellyn, Illinois 60137 l

Mr. William Miller, Auditor p

Goodhue County Courthouse

-Red Wing, Minnesota -55066 L

s