Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19261D552 + (ML19261D552)
- ML19261D553 + (ML19261D553)
- ML19261D554 + (ML19261D554)
- ML19261D555 + (ML19261D555)
- 05000366/LER-1979-029-03, /03L-1 on 790315:while Shut Down for Repairs,Main Steam Safety Relief Valve Discharge Line Vacuum Breaker Valves Found to Be Partially Opened, Hinge Pins Bent & Springs Distorted.Caused by Valves Being Slammed Open + (ML19261D556)
- ML19261D557 + (ML19261D557)
- 05000366/LER-1979-043, Forwards LER 79-043/03L-0 + (ML19261D558)
- ML19261D559 + (ML19261D559)
- ML19261D560 + (ML19261D560)
- ML19261D561 + (ML19261D561)
- 05000366/LER-1979-043-03, /03L-0 on 790527:while Performing Normal Surveillance Procedure HNP-2-3011 on Pressure Switches 2B21-N020A & B,Switches Tripped at 1,066 & 1,067 Psig. Caused by Setpoint Drift + (ML19261D562)
- ML19261D563 + (ML19261D563)
- 05000366/LER-1979-045, Forwards LER 79-045/01T-0 + (ML19261D564)
- ML19261D565 + (ML19261D565)
- 05000366/LER-1979-045-01, /01T-0 on 790603:following Reactor Scram, HPCI Sys Received Initiation Signal But Failed to Start When Turbine Stop Valve Did Not Open.Caused by Seal Water Line Leaking Water to Bracket Drain Cavity.Line Repaired + (ML19261D568)
- 05000312/LER-1979-001-04, /04L-0 on 790529:plant Liquid Effluent Ph Exceeded 8.5 Limit.Probably Caused by Error Band Associated W/Ph Alarm Setpoint.Investigation Feasibility of Reducing Error Band + (ML19261D569)
- 05000133/LER-1979-003, Forwards LER 79-003/03L-0 + (ML19261D570)
- 05000133/LER-1979-003-03, /03L-0 on 790513:fire Water Sys Header Low Pressure Switch APS-18 Started Fire Pumps at 41 Psig Instead of 45 Psig.Caused by Drift & Close Differential Setting. Setpoint Adjusted Switch Will Be Replaced + (ML19261D572)
- ML19261D573 + (ML19261D573)
- ML19261D575 + (ML19261D575)
- ML19261D576 + (ML19261D576)
- ML19261D577 + (ML19261D577)
- ML19261D579 + (ML19261D579)
- ML19261D580 + (ML19261D580)
- ML19261D581 + (ML19261D581)
- ML19261D582 + (ML19261D582)
- ML19261D583 + (ML19261D583)
- ML19261D590 + (ML19261D590)
- ML19261D591 + (ML19261D591)
- ML19261D593 + (ML19261D593)
- ML19261D594 + (ML19261D594)
- ML19261D596 + (ML19261D596)
- ML19261D597 + (ML19261D597)
- ML19261D599 + (ML19261D599)
- ML19261D601 + (ML19261D601)
- 05000323/LER-1979-035, Forwards LER 79-035/03L-0 + (ML19261D602)
- ML19261D603 + (ML19261D603)
- 05000325/LER-1979-035-03, /03L-0 on 790517:coolant Sample Line Isolation Valves Would Not Close.Caused by Solenoids Stuck in Open Position & Control Switches of Sample Station Shorted. Solenoids Were Cleaned & Returned to Svc + (ML19261D604)
- ML19261D605 + (ML19261D605)
- ML19261D606 + (ML19261D606)
- ML19261D607 + (ML19261D607)
- 05000237/LER-1979-034, Forwards LER 79-034/01T-0 + (ML19261D608)
- ML19261D609 + (ML19261D609)
- 05000237/LER-1979-034-01, /01T-0 on 790530:diesel Generator Failed to Start During Operability Test.Caused by Failure to Engage of Lower Air Start Bendix Gear.Gear Aligment Will Be Checked After Diesel Generator Tests + (ML19261D610)
- ML19261D611 + (ML19261D611)
- ML19261D613 + (ML19261D613)
- ML19261D614 + (ML19261D614)
- ML19261D615 + (ML19261D615)
- ML19261D616 + (ML19261D616)
- ML19261D617 + (ML19261D617)
- ML19261D618 + (ML19261D618)