Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19249B509 + (ML19249B509)
- ML19249B511 + (ML19249B511)
- ML19249B512 + (ML19249B512)
- ML19249B513 + (ML19249B513)
- ML19249B514 + (ML19249B514)
- ML19249B515 + (ML19249B515)
- ML19249B516 + (ML19249B516)
- ML19249B517 + (ML19249B517)
- ML19249B519 + (ML19249B519)
- ML19249B520 + (ML19249B520)
- ML19249B521 + (ML19249B521)
- ML19249B522 + (ML19249B522)
- ML19249B523 + (ML19249B523)
- ML19249B524 + (ML19249B524)
- ML19249B525 + (ML19249B525)
- 05000302/LER-1979-073, Forwards LER 79-073/03L-0 + (ML19249B526)
- ML19249B527 + (ML19249B527)
- ML19249B529 + (ML19249B529)
- ML19249B530 + (ML19249B530)
- ML19249B531 + (ML19249B531)
- 05000302/LER-1979-073-03, /03L-0:on 790801,during Mode 1 Operation,Absolute Rod Position Indication for Rod 4,Group 7 Fluctuated 3-40% Caused by Sticking Reed Switches.Absolute Position on Indicator Tube Replaced + (ML19249B532)
- 05000368/LER-1979-060-03, /03L-0:on 790802,failure of Reactor Drain Tank 2T68 Discharge Reactor Bldg Penetration to Close from Control Signal.Caused by Crystallization of Boron in Vent on Valve Operator Piston.Valve Cleaned & Returned to Svc + (ML19249B533)
- ML19249B534 + (ML19249B534)
- ML19249B535 + (ML19249B535)
- 05000368/LER-1979-061-03, /03L-0:on 790804,failure of Low Pressure Nitrogen Supply in Reactor Bldg Penetration,Outside Isolation Valve, to Close on Control Signal.Caused by Limit Setpoint Drift. Limit Adjusted & Valve Returned to Svc + (ML19249B536)
- ML19249B537 + (ML19249B537)
- ML19249B541 + (ML19249B541)
- ML19249B542 + (ML19249B542)
- ML19249B543 + (ML19249B543)
- ML19249B544 + (ML19249B544)
- ML19249B546 + (ML19249B546)
- ML19249B547 + (ML19249B547)
- ML19249B548 + (ML19249B548)
- LD-79-036, Forwards Info Requested by IE Bulletin 78-12,Atypical Weld Matl in Reactor Pressure Vessel Welds Which Addresses All Applicable Matls Used in Fabrication of Reactor Vessels. W/O Encl + (ML19249B549)
- ML19249B553 + (ML19249B553)
- 05000368/LER-1979-062-03, /03L-0:on 790804,failure of Full Length Control Element Assembly 39 to Move.Caused by Failed Control Element Assembly Enable Card.Card Replaced & Assembly Declared Operable within 1-h of Failure + (ML19249B554)
- ML19249B556 + (ML19249B556)
- ML19249B557 + (ML19249B557)
- 05000271/LER-1979-015, Forwards LER 79-015/03L-0 + (ML19249B558)
- ML19249B559 + (ML19249B559)
- ML19249B560 + (ML19249B560)
- ML19249B561 + (ML19249B561)
- ML19249B564 + (ML19249B564)
- ML19249B566 + (ML19249B566)
- 05000271/LER-1979-015-03, /03L-0:on 790802,during Investigation of Seismic Class 1 Hangers,Anchor Bolts of MS-H-A10 Found Dislodged from Wall.Cause Unknown at Present.Present Review of Seismic Class 1 Sys Will Identify Necessary Mods + (ML19249B568)
- ML19249B569 + (ML19249B569)
- ML19249B570 + (ML19249B570)
- ML19249B573 + (ML19249B573)
- ML19249B574 + (ML19249B574)
- ML19249B575 + (ML19249B575)
- ML19249B578 + (ML19249B578)