Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18085B172 + (ML18085B172)
- ML18085B173 + (ML18085B173)
- ML18085B179 + (ML18085B179)
- ML18085B180 + (ML18085B180)
- ML18085B189 + (ML18085B189)
- ML18085B193 + (ML18085B193)
- W3F1-2017-0050, License Amendment Request - Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update + (ML18085B196)
- IR 05000458/2018010 + (ML18085B197)
- ML18085B198 + (ML18085B198)
- ML18085B200 + (ML18085B200)
- ZS-2016-0113, State of Il, Dept. of Natural Resources - Submittal of Final Determination Letter Authorizing the Construction of a Temporary Roadway/Ramp in the Lake Michigan Nearshore at the Zion Nuclear Plant in Zion, Il + (ML18086A001)
- ML18086A006 + (ML18086A006)
- ML18086A012 + (ML18086A012)
- RA-18-032, Revision to Commitments Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues + (ML18086A013)
- ML18086A013 + (ML18086A013)
- PNP 2018-015, Submittal of Revision 30 to Emergency Plan + (ML18086A014)
- ML18086A025 + (ML18086A025)
- ML18086A027 + (ML18086A027)
- ML18086A029 + (ML18086A029)
- 05000244/LER-2018-001, R.E. Gina Nuclear Power Plant Regarding Leakage in Reactor Coolant System Pressure Boundary Through an Existing Weld in Original Installation Equipment Due to Orifice Wear/Erosion Resulting in Progressively Increasing System + (ML18086A032)
- L-2018-071, Submittal of Revision 19 to the Physical Security Plan + (ML18086A038)
- ML18086A090 + (ML18086A090)
- ML18086A091 + (ML18086A091)
- PNP 2018-014, Response to Request for Additional Information - Alternative to the Reexamination Frequency for a Relevant Condition Foreign Material Lodged in the Reactor Pressure Vessel + (ML18086A097)
- ML18086A100 + (ML18086A100)
- ML18086A106 + (ML18086A106)
- ML18086A132 + (ML18086A132)
- ML18086A134 + (ML18086A134)
- ML18086A135 + (ML18086A135)
- ML18086A136 + (ML18086A136)
- ML18086A137 + (ML18086A137)
- ML18086A138 + (ML18086A138)
- ML18086A140 + (ML18086A140)
- ML18086A146 + (ML18086A146)
- ML18086A149 + (ML18086A149)
- ML18086A150 + (ML18086A150)
- SVP-18-020, Core Operating Limits Report for Quad Cities Unit 2 Cycle 25 + (ML18086A152)
- ML18086A153 + (ML18086A153)
- L-2018-077, Schedule for Re-Analysis of Turkey Point Licensing Basis Analyses Affected by PAD5 Implementation + (ML18086A154)
- ML18086A156 + (ML18086A156)
- ML18086A161 + (ML18086A161)
- ML18086A164 + (ML18086A164)
- ML18086A167 + (ML18086A167)
- ML18086A168 + (ML18086A168)
- ML18086A169 + (ML18086A169)
- ML18086A170 + (ML18086A170)
- ML18086A171 + (ML18086A171)
- ML18086A172 + (ML18086A172)
- ML18086A173 + (ML18086A173)
- ML18086A174 + (ML18086A174)
- ML18086A176 + (ML18086A176)