L-2018-071, Submittal of Revision 19 to the Physical Security Plan

From kanterella
Jump to navigation Jump to search
Submittal of Revision 19 to the Physical Security Plan
ML18086A038
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/22/2018
From: Coffey R
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2018-071
Download: ML18086A038 (5)


Text

SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Re:

Florida Power & Light Company Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revision 19 to the Physical Security Plan 10 CPR 50.4(b)(4) 10 CPR 50.54(p)(2) 10 CPR 73.22 L-2018-071 March 22, 2018 In accordance with 10 CPR 50.4(b)(4), "Security plan and related submissions," and 10 CPR 50.54(p)(2), "Conditions of licenses," Florida Power & Light Company (FPL), the licensee for Turkey Point Nuclear Plant, Units 3 and 4, hereby submits Revision 19 to the "Florida Power &

Light Turkey Point Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program", collectively the PSP. PSP Revision 19 concerns administrative changes. to this letter contains PSP Revision 19 which is safeguards information (SGI). contains a change synopsis of PSP Revision 19 (SGI). Enclosure 3 contains the FPL evaluation of the PSP Revision 19 change in accordance with 10 CPR 50.54(p ), which is Security Related information.

SAFEGUARDS INFORMATION (Enclosures 1 and 2 contain Safeguards Information. Enclosure 3 contains Security Related information. Upon separation this page is decontrolled.)

So D l Florida Power & Light Company 9760 SW 344th St., Homestead, FL 33035 N f!-(Z

SAFEGUARDS INFORMATION Florida Power & Light Company Letter L-2018-071 Revision 19 to the Physical Security Plan Page 2 of 2 Should you have any questions regarding this submission, please contact Mr. Orlando Hernandez, Security Site Manager at 305-246-6605 or Mr. Robert Hess, Licensing Manager, at 305-246-4112.

Sincerely,

~~

Robert Coffey Regional Vice President - Southern Region Turkey Point Nuclear Plant

Enclosures:

1)
2)
3)

FPL Turkey Point Units 3 and 4 PSP Revision 19 (SGI)

Change Synopsis (SGI) 10 CFR 50.54(p) Evaluation (Security Related) cc:

Regional Adtninistrator, USNRC Region II (with enclosures)

Project Manager, USNRC, Turkey Point (without enclosures)

Senior Resident Inspector, USNRC, Turkey Point (without enclosures)

SAFEGUARDS INFORMATION (Enclosures 1 and 2 contain Safeguards Information. Enclosure 3 contains Security Related information. Upon separation this page is decontrolled)

SAFEGUARDS INFORMATION Florida Power & Light Company Letter L-2018-071 Revision 19 to the Physical Security Plan Florida Power & Light Turkey Point Nuclear Plant, Revision 19, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan & Independent Spent Fuel Storage Installation Plan, January 25, 2018 (In sequence: 1 non-SGI page, 147 SGI pages, and 1 non-SGI page follow)

SAFEGUARDS INFORMATION (Enclosure 1 contains Safeguards Information. Upon separation this page is decontrolled.)

SAFEGUARDS INFORMATION Florida Power & Light Company Letter L-2018-071 Revision 19 to the Physical Security Plan Change Synopsis for the Florida Power & Light Company Turkey Point Nuclear Generating Station Units 3 & 4 Physical Security Plan, Revision 19 (In sequence: 1 non-SGI page, 3 SGI pages, and 1 non-SGI page follow)

SAFEGUARDS INFORMATION (Enclosure 2 contams Safeguards Information. Upon separation this page is decontrolled.)

Security Related Information - Withhold in Accordance with 10 CFR 2.390 Florida Power & Light Company Letter L-2018-071 Revision 19 to the Physical Security Plan Turkey Point Nuclear Generating Station Units 3 & 4, Physical Security Plan, Revision 19, 10 CFR 50.54(p) Submission, January 25, 2018 (5 Security Related pages follow)

Security Related Information - Withhold in Accordance with 10 CFR 2.390 (Enclosure 3 contains Security Related Information. Upon separation this page is decontrolled.)