Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PLA-2645, Forwards Supplemental Info Re Application for Amends 80 & 33 to Licenses NPF-14 & NPF-22,respectively,per 860428 Telcon Request.Srp Sections Re Design of Fifth Diesel Generator Facility Addressed + (ML18040B149)
- PLA-2661, Forwards Application for Proposed Amend 39 to License NPF-22,revising Tech Specs to Support Cycle 2 Reload.Fee Paid + (ML18040B150)
- ML18040B151 + (ML18040B151)
- PLA-2668, Forwards Response to Request for Addl Info Re Proposed Amends 80 & 30 to Licenses NPF-14 & NPF-22,respectively, Revising Tech Specs to Reflect Incorporation of Fifth Diesel Generator Into Plant Design.Three Oversize Drawings Encl + (ML18040B152)
- PLA-2677, Forwards Audited Financial Statements & Other Financial Info for Allegheny Electric Cooperative,Inc for Nov 1984 - Oct 1985 + (ML18040B154)
- ML18040B156 + (ML18040B156)
- ML18040B157 + (ML18040B157)
- ML18040B158 + (ML18040B158)
- PLA-2705, Forwards Rev 0 to ISI-T-207.0, Component Listing & Inservice Insp 10 Yr Plan & Response to NRC 860204 Request for Addl Info on Inservice Insp Programs + (ML18040B159)
- PLA-2756, Forwards Postulated Pipe Rupture Calculations M-MSS-010 & M-MSS-006,per NRC 861112 Telcon Request + (ML18040B165)
- ML18040B167 + (ML18040B167)
- IR 05000387/1986024 + (ML18040B170)
- ML18040B173 + (ML18040B173)
- ML18040B174 + (ML18040B174)
- PLA-2820, Pennsylvania Power & Light Co,1986 Annual Rept + (ML18040B178)
- PLA-2847, Forwards Annual Financial Rept for 1986,including Certified Financial Statements for Allegheny Electric Cooperative,Inc for Nov 1985 - Oct 1986 + (ML18040B181)
- IR 05000387/1987010 + (ML18040B183)
- PLA-2906, Forwards Revised App R Deviation Request 13, Essential Redundant Raceway Protection. Util Plans to Wrap Raceway Per Deviation During Unit 1 Third Refueling & Insp Outage + (ML18040B186)
- ML18040B188 + (ML18040B188)
- ML18040B189 + (ML18040B189)
- IR 05000387/1987018 + (ML18040B193)
- PLA-2953, Forwards Application for Proposed Amend 58 to License NPF-22,changing Tech Specs to Support Cycle 3 Reload.Unit Scheduled to Shutdown on 880305 & Restart on 880503.Reload Summary & Transient Analysis Repts Encl.Fee Paid + (ML18040B194)
- PLA-2966, Forwards Util Final Response to IE Bulletin 85-003, Motor- Operated Valve Common Mode Failure Due to Improper Switch Settings + (ML18040B195)
- IR 05000387/1987019 + (ML18040B196)
- PLA-2959, Responds to NRC Re Violations Noted in Insp Repts 50-387/87-19 & 50-388/87-19.Corrective Actions:Nuclear Dept Instruction & Plant Administrative Procedures Revised to Reflect Suitability of Individuals for Certain Mgt Position + (ML18040B196)
- ML18040B200 + (ML18040B200)
- PLA-3009, Pennsylvania Power & Light Co Annual Rept 1987 + (ML18040B207)
- ML18040B209 + (ML18040B209)
- PLA-3049, Forwards 1987 Annual Rept for Allegheny Electric Cooperative,Inc + (ML18040B213)
- PLA-2575, Forwards Plant Rept Summarizing Safety Evaluations Approved for 1984 + (ML18040B219)
- PLA-3066, Forwards Comments to Each Specific SALP Category,Per 880707 Meeting W/Nrc.Presentations from Meeting Also Encl + (ML18040B220)
- PLA-3060, Responds to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. Staff Position on Matls, Water Chemistry,Crack Evaluation & Repair Criteria & Insp Schedules Among Topics Addressed.Flaw Evaluations Encl + (ML18040B222)
- PLA-3117, Forwards Listed Addl Info Re Plant Fire Protection Review rept.W/16 Oversize Drawings + (ML18040B233)
- PLA-3150, Semiannual Effluent & Waste Disposal Rept,Jul-Dec 1988 + (ML18040B238)
- ML18040B239 + (ML18040B239)
- ML18040B240 + (ML18040B240)
- PLA-3180, Forwards Application for Amends to Licenses NPF-14 & NPF-22, Resulting from Mods Performed to Essential Svc Water Sys,Per 10CFR50,App R,Consisting of Proposed Amends 23 & 70 + (ML18040B244)
- PLA-3191, Pennsylvania Power & Light Co Annual Financial Rept,1988. Alleghany Electric Cooperative,Inc Financial Statements & Encl + (ML18040B247)
- PLA-3215, Forwards Summary Rept of Safety Evaluations Approved During 1988.Changes Include Backseating Control Box to Electrically Backset HV-202168 to Reduce Steam Leakage & Rerouting Condensate Supply Line to Main Condenser Keepfill + (ML18040B250)
- PLA-3238, Discusses Insp of Operational Status of Emergency Preparedness Program.Susquehanna Review Committee 1987 & 1988 Emergency Plan Audits Encl W/Other Supporting Documentation + (ML18040B253)
- PLA-3253, Semiannual Effluent & Waste Disposal Rept for Jan-June 1989 + (ML18040B255)
- ML18040B256 + (ML18040B256)
- PLA-3263, Forwards Final Response to Request for Addl Info Re Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. Listed Items Included in Previous & Current Ref Responses + (ML18040B258)
- ML18040B261 + (ML18040B261)
- ML18040B262 + (ML18040B262)
- PLA-3297, Forwards Response to Generic Ltr 89-21.Table of USIs for Which Technical Resolution Has Been Achieved Encl + (ML18040B265)
- PLA-3321, Forwards Rev 0 to SEA-CW-037, Analysis of B & C 1989 Diesels Failure. Rept Details Util Analysis of Overpressurization Incidents Which Occurred in Sept & Oct 1989 of Diesel Generators + (ML18040B267)
- ML18040B268 + (ML18040B268)
- ML18040B270 + (ML18040B270)
- PLA-3623, Submits Util Calculation FQ-C-JAN-002, Evaluation of Out of Limit RPV Cooldown/Heatup Rate Occurring on 890112 + (ML18040B276)
- PLA-4192, Provides Initial Response to GL 94-03, IGSCC of Core Shrouds in Bwrs. Remaining Info Re Insp Plans,Repair Plans & Insp Results Will Be Submitted to NRC Per Schedules Noted in GL + (ML18040B283)