Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17228A213 + (ML17228A213)
- ML17228A215 + (ML17228A215)
- ML17228A216 + (ML17228A216)
- ML17228A218 + (ML17228A218)
- L-93-175, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-335/93-12.Corrective Actions:Revised MP 1-M-0014 LPSI Disassembly & Reassembly to Incorporate Neccessary Installation Details for LPSI Pump Trico Oiler + (ML17228A219)
- L-93-144, Application for Amends to Licenses DPR-67 & NPF-16,revising TS to Support Implementation of New Stds for Protection Against radiation,10CFR20.1001 Through 20.2401 + (ML17228A220)
- ML17228A221 + (ML17228A221)
- ML17228A222 + (ML17228A222)
- ML17228A223 + (ML17228A223)
- IR 05000335/1993015 + (ML17228A225)
- ML17228A227 + (ML17228A227)
- ML17228A229 + (ML17228A229)
- L-93-187, Forwards Replacement Page for Environ Operating Rept for 1992 + (ML17228A230)
- ML17228A231 + (ML17228A231)
- ML17228A232 + (ML17228A232)
- ML17228A234 + (ML17228A234)
- L-93-190, Forwards Relief Request 13, Repair Requirements for Class 2 Tank for Temporary non-code Repair to Unit 1 RWT Botton for Approval.Rev 1 to SE JPN-PSL-SENP-93-035, Evaluation of Inventory Loss from RWT, St Lucie,Unit 1 Also Encl + (ML17228A235)
- ML17228A236 + (ML17228A236)
- ML17228A238 + (ML17228A238)
- ML17228A240 + (ML17228A240)
- ML17228A243 + (ML17228A243)
- L-93-191, Forwards Rev 0 of PSL-200, St Lucie...Unit 2 Second ISI Interval Program Plan & Schedule & Rev 0 of PSL-201, St Lucie...Unit 2 Second ISI Interval ISI Selected Component Schedule. Subj Interval Begins on 930808-200803 + (ML17228A244)
- ML17228A245 + (ML17228A245)
- ML17228A246 + (ML17228A246)
- ML17228A247 + (ML17228A247)
- IR 05000335/1993012 + (ML17228A250)
- L-93-198, Monthly Operating Repts for Jul 1993 for St Lucie,Units 1 & 2 + (ML17228A253)
- ML17228A255 + (ML17228A255)
- L-93-207, Comments on Suppl to GL 86-10, Fire Endurance Acceptance Criteria for Fire Barrier Sys Used to Separate Redundant Safe Shutdown Trains within Same Fire Area + (ML17228A258)
- L-93-206, Forwards St Lucie Nuclear Plant,Unit 1 Reactor Containment Bldg ILRT Rept,Documenting Results of Type a Leakage Rate Testing & Including Suppl Controlled Leakage Rate Test Method Utilized for Verification.Test Completed on 930520 + (ML17228A262)
- ML17228A263 + (ML17228A263)
- ML17228A264 + (ML17228A264)
- L-93-183, Application for Amend to License NPF-16,deleting Option of Using Movable Incore Detector to Determine Incore Instrumentation Sys Operability from TS 3.3.3.2 + (ML17228A265)
- ML17228A266 + (ML17228A266)
- ML17228A267 + (ML17228A267)
- ML17228A268 + (ML17228A268)
- L-93-127, Application for Amend to License NPF-16,requesting Approval of Improved Methodology, Extended Statistical Combination of Uncertainties (Escu). Proprietary Rept CEN-371(F)-P Encl.Rept Withheld (Ref 10CFR2.790(a)(4)) + (ML17228A269)
- ML17228A270 + (ML17228A270)
- ML17228A271 + (ML17228A271)
- ML17228A272 + (ML17228A272)
- IR 05000335/1993018 + (ML17228A274)
- ML17228A276 + (ML17228A276)
- ML17228A280 + (ML17228A280)
- FOIA/PA-2017-0634 + (ML17228A284)
- L-93-215, Informs That CEOG Rept CEN-387-P,Rev 1,applicable & Bounds Plant & Except for NRC Bulletin 88-011,Action Item 1.d, Updating of Plant Specific Stress & Fatigue Analyses,Actions in Bulletin Complete.Item to Be Complete by 940131 + (ML17228A286)
- ML17228A289 + (ML17228A289)
- L-93-232, Responds to 930728 RAI Response to GL 92-01 Rev 1, Reactor Vessel Structural Integrity Per 10CFR50.54(f) + (ML17228A292)
- L-93-236, Forwards St Lucie Unit 1,Cycle 12 Startup Physics Testing Rept + (ML17228A293)
- ML17228A294 + (ML17228A294)
- ML17228A295 + (ML17228A295)
- ML17228A296 + (ML17228A296)