- ML14188A574 + (ML14188A574)
- ML14188A575 + (ML14188A575)
- ML14188A577 + (ML14188A577)
- ML14188A581 + (ML14188A581)
- PNO-II-88-053, on 880830,licensee Commenced Orderly Shutdown in Order to Facilitate Testing of Svc Water (SW) Sys Associated W/Containment Fan Coolers.Results of SW Testing Last Wk Indicated Negative Pressures.Addl Pump Maint Needed + (ML14188A588)
- PNO-II-88-053A, on 880919,unit Restarted,Following 20 Day Outage to Resolve Reduced Pressures on Svc Water Outlet of Hydrogen Vent Header (Hvh) Containment Fan Coolers.Caused by Biological Fouling.Hvh Cleaned + (ML14188A594)
- PNO-II-88-059, on 880922,unusual Event Re Plant Shutdown Occurred.Inboard & Outboard Butterfly Containment Purge Exhaust Isolation Valves Inoperable.Repairs Underway + (ML14188A596)
- ML14188A598 + (ML14188A598)
- PNO-II-88-063, on 881014,orderly Shutdown of Plant Based on Postulated Event Which Could Result in Overloading Power. Licensee Plans to Replace Cable W/One Having Higher Temp Rating & Reroute New Cable in Different Cable Tray + (ML14188A605)
- ML14188A614 + (ML14188A614)
- ML14188A618 + (ML14188A618)
- ML14188A621 + (ML14188A621)
- ML14188A624 + (ML14188A624)
- ML14188A630 + (ML14188A630)
- PNO-II-89-004, on 890107,flammable Mixture of Hydrogen Introduced Into Air Sys,Instead of Supplying Air to Main Generator.Cause Under Investigation.Plant Remains in Refueling Outage + (ML14188A633)
- ML14188A634 + (ML14188A634)
- PNO-II-89-004A, on 890107,plant Site in Unusual Event Status Due to Injection of Hydrogen Into Plant Air Sys.Caused by Multiple Failures of Administrative Controls.On 890116-17, INPO Conducted Independent Investigation of Event + (ML14188A635)
- ML14188A653 + (ML14188A653)
- ML14188A654 + (ML14188A654)
- ML14188A656 + (ML14188A656)
- PNO-II-89-029, on 890403,unit Taken Offline to Recover Loose Part on Primary Side of C Steam Generator.Unit Being Placed in Cold Shutdown & Resident Inspectors & Regional Staff Monitoring Ongoing Evaluations + (ML14188A668)
- ML14188A669 + (ML14188A669)
- ML14188A674 + (ML14188A674)
- ML14188A686 + (ML14188A686)
- ML14188A691 + (ML14188A691)
- ML14188A699 + (ML14188A699)
- PNO-II-89-059, on 890822,reactor Shutdown in Excess of 48 H Following Evaluation Confirming That Net Positive Suction Head Provided to Auxiliary Feedwater Pumps Inadequate at Rated Flow.Util Developing Plan for Corrective Action + (ML14188A704)
- PNO-II-89-059A, on 890828,Augmented Insp Team Dispatched to Site to Investigate Deficiency in Auxiliary Feedwater Sys. Comprehensive Plan Developed to Evaluate & Replace Piping & Other Components.Util Will Meet W/Nrc Prior to Startup + (ML14188A705)
- PNO-II-89-059B, on 890828,Augmented Insp Team Dispatched to Site to Investigate Deficiency in Auxiliary Feedwater Sys. Licensee Pursuing Redesign of Auxiliary Feedwater Sys.Util Will Meet W/Nrc Prior to Plant Restart + (ML14188A707)
- ML14188A711 + (ML14188A711)
- ML14188A712 + (ML14188A712)
- ML14188A716 + (ML14188A716)
- ML14188A722 + (ML14188A722)
- ML14188A724 + (ML14188A724)
- ML14188A725 + (ML14188A725)
- ML14188A731 + (ML14188A731)
- ML14188A734 + (ML14188A734)
- ML14188A739 + (ML14188A739)
- ML14188A745 + (ML14188A745)
- ML14188A746 + (ML14188A746)
- ML14188A748 + (ML14188A748)
- ML14188A749 + (ML14188A749)
- ML14188A751 + (ML14188A751)
- ML14188A752 + (ML14188A752)
- ML14188A755 + (ML14188A755)
- ML14188A787 + (ML14188A787)
- ML14188A788 + (ML14188A788)
- ML14188A794 + (ML14188A794)
- ML14188A797 + (ML14188A797)
- ML14188A799 + (ML14188A799)
- ML14188A826 + (ML14188A826)