Search results
Jump to navigation
Jump to search
- such defect or noncompliance. (Inclusion of Note T2055 is standard on all QA level 1 device requisitions.) 4. Note T2056 requires the vendor to provide access18 KB (2,775 words) - 11:19, 6 January 2025
- consistent with Note (i) of SQN Unit 1 TS Table 3.3.2-1, Functions 5a and 5b and Note (j) of SQN Unit 2 TS Table 3.3.2-1, Functions 5a and 5b and Note (k) of TS52 KB (9,043 words) - 07:26, 25 November 2024
- corrects a typographical error in Note 1 of Figures 1 - 8. The revision also corrects Note 2 of Figures 1,2 and 4 - 8. Note 2, as it appeared in the original2 KB (194 words) - 14:43, 17 December 2024
- 3.8.1.2 Note 3, but does not provide information on the modified DG start. NSPMs purpose of removal of operability details from SR 3.8.1.2 Note 3 is achieved14 KB (2,254 words) - 07:37, 25 November 2024
- seconds (Note 5) A PCT = +0 F l Bottom Head Drain Flowpath (Note 6) A PCT = +10 F Remove NRC SER requirement for Core Spray Header Flaw (Note 7) A PCT53 KB (9,242 words) - 23:33, 6 December 2024
- Assessment Note 30 of Reference 2 See Assessment Note 9 of Reference 2 The analyzed CS pump leakage (400 gpm for Units 1 & 2 as described in note 8, plus23 KB (4,039 words) - 16:26, 6 December 2024
- exceeded in the four RCS cold legs. Although the intent of LCO 3.5.2 Note 1 and Note 2 are different, the action of isolating ECCS pumps from their ability55 KB (9,568 words) - 11:59, 24 November 2024
- RESPONSE NOT OBTAINED GO TO Step 5. NOTE: shows location of Primary RAA and Secondary RAA. 5 GO TO DESIGNATED RAA NOTE: SRDs should be securely fastened112 KB (19,311 words) - 20:01, 5 January 2025
- Elimination Act sec. 1704 (44 U.S.C. 3504 note); E.O. 10865, as amended, 3 CFR, 1959 -1963 Comp., p. 398 (50 U.S.C. 401, note); E.O. 12829, 3 CFR, 1993 Comp., p3 KB (282 words) - 21:25, 17 November 2014
- seconds (Note 5) A PCT = +0 F Bottom Head Drain Flowpath (Note 6) A PCT = +10*F i Remove NRC SER requirement for Core Spray Header Flaw l (Note 7) A PCT53 KB (9,309 words) - 14:31, 7 December 2024
- Elimination Act sec. 1704 (44 U.S.C. 3504 note); E.O. 10865, as amended, 3 CFR 1959- 1963 Comp., p. 398 (50 U.S.C. 401, note); E.O. 12829, 3 CFR, 1993 Comp., p4 KB (370 words) - 12:07, 19 March 2017
- pages 3.1-15 and 3.1-17 which include the reference to Note (aa) and the approved wording of Note h, respectively. GPU Nuclear regrets any incoavenience3 KB (382 words) - 17:36, 6 December 2024
- OPDT (Vary Tavg) Weed N9004E-2B (Note 1) NRA+NSA+NSA+NSA+NSA+NAL 368ms Input 20ms OPDT(Vary DeltaT) Weed N9004E-2B (Note 1) NRA+NSA+NSA+ NAL 293ms input8 KB (1,221 words) - 07:41, 10 December 2024
- 3504 note). Sections 13.13(a) and (b) also issued under Pub. L. 101-410, as amended by section 31001(s), Pub. L. 104-134, (28 U.S.C. 2461 note). Source:4 KB (333 words) - 16:54, 20 March 2017
- added a one-time-use note to SR 3.7.2.4 as a result of an emergency Tech Spec amendment. That note is no longer applicable and as this note is listed on one253 KB (42,454 words) - 02:32, 16 March 2025
- and formatting difference 3.4.7 CONDITION A REQUIRED ACTIONS A.2 and A.3 Note: No differences were identified between NUREG-1434 and plant TS (i.e., Clinton131 KB (24,987 words) - 18:07, 2 January 2025
- no ' Note 2 002 Airlock inner Door Seals. Note 3 Note 3 Note 3 Note 3 Note 3 yes Note 2 002 Airlock Outer Door Seals Note 3 Note 3 Note 3 Note 3 Note 3 yes25 KB (5,789 words) - 03:17, 21 December 2024
- 27, 2017 (Note 1) PCT = N/A 10 CFR 50.46 Report dated January 26, 2018 (Note 2) PCT = -8°F 10 CFR 50.46 Report dated January 25, 2019 (Note 3) PCT = 0°F20 KB (3,226 words) - 20:40, 24 November 2024
- (SGTP 20%, Note 10) APCT = 21.0*F Passive Heat Sink Increase (Note 11) APCT = 16.0*F i Reactor Coolant Fan Cooler (RCFC) Performance (Note 11) APCT = 131 KB (5,178 words) - 02:26, 7 December 2024
- Volume (Note 8) 10,223.3 in3 (0.1677 m3) (Note 8) 8,736.2 in3 = (132.6 in) x (8.117 in)2 (0.1432 m3) (calculated) (Note 8) Power Density (Note 9) 103 MWt/m351 KB (8,512 words) - 15:15, 27 November 2024