ML20237L749  +
TXX-6545, Advises That Util Evaluating Alternate Resolution Re Potential Zinc Embrittlement of Stainless Steel Tubing & walk-down Activities Suspended Pending Completion of Evaluation,Per 870414 Response to Notice of Violation +, TXX-6655, Provides Revised Response to Violation Noted in Insp Repts 50-445/85-14 & 50-446/85-11.Corrective Actions:Pipe Supports Returned from Operations to Engineering & Const Function to Establish Controls & Vital Drawings List Developed +, TXX-6625, Interim Deficiency Rept CP-85-19 Re Design Requirements & Documents for safety-related Plant Conduit & Conduit Supports.Initially Reported on 861021.Revised Calculation Based on Effective Thread Dimension.Next Rept by 871009 +, TXX-6659, Advises That Conversion of Previously Used Documents to Appropriate Corrective Action Documents Completed on 870702, Per Insp Repts 50-445/86-26 & 50-446/86-22 +, TXX-6615, Forwards Revs to Previously Submitted Manuals Describing Use of Comanche Peak Response Team Checklists +, TXX-6626, Final Deficiency Rept CP-87-17 Re Operation of Power Supplies Mfg by Validyne Engineering Corp.Initially Reported on 870608.Issue Not Reportable Under 10CFR50.55(e) +, TXX-6617, Interim Deficiency Rept CP-87-12 Re Containment Pressure/ Temp Analysis Computer Error.Initially Reported on 870612. Reanalysis of Main Steam Line Break Accident Completed.Next Rept Will Be Submitted by 871211 +, TXX-6613, Interim Deficiency Rept CP-86-04 Re Richmond Inserts to Embedded Plates & Welded Attachments to Embedded Plates. Initially Reported on 870213.Spacing Criteria Issues Resolved.Qc Instructions Added.Next Rept Expected by 871005 +, TXX-6620, Final Deficiency Rept CP-87-31 Re Diesel Generator Control Air Regulator.Initially Reported on 870706.No Deficiency Existed at Plant,Per Imo Delaval Part 21 Rept.Deficiency Not Reportable Under 10CFR50.55(e) +, TXX-6582, Forwards Table of Comments Not Included in Util 870815 Clarification of Fire Protection Program,Per Sser 12 (NUREG-0797).Fire Protection Program Review & Fire Hazards Analysis Incorporated Into Design Basis Documents.W/O Encl +, TXX-6479, Forwards Rev 1 to Large Bore Pipe Stress & Pipe Support Generic Issues Rept. All Future Revs Will Be Provided in Apps a & B of Large Bore Piping & Pipe Supports Project Status Rept +, TXX-6605, Forwards Addl Info Re Notice of Deviation,Item 2 from Insp Repts 50-445/86-08 & 50-446/86-06,per 870706 Meeting W/ Rf Warnick.Disagrees W/Alleged Deviation.Procedure CP-QAP-19.1 Not Required to Be Consistent W/Ansi N45.2.12 +, TXX-6622, Interim Deficiency Rept CP-86-35 Re Motor Operators for Valves in Main Steam Sys.Initially Reported on 860602. Corrective Action Implementation in Progress.Next Rept Anticipated No Later than 871002 +, TXX-6571, Forwards Description of Amend 64 to Fsar,Transmitted by .Amend Provides Updates,Additions & Editorial Changes as Well as Revised Effective Page Listing.Topics Included in Revs Listed.W/O Encl +, TXX-6570 +, TXX-6618, Interim Deficiency Rept CP-86-52 Re Splice/Connections Used for Cable Trays.Initially Reported on 860429.Evaluation Continuing.Next Rept Expected by 870903 +, TXX-6598, Forwards Wg Counsil to Nh Williams Transmitting Documents Requested by Cygna.M Malloy 870805 Release Memo Encl +, TXX-6606, Interim Deficiency Rept CP-86-19 Re Installation of Steam Svc Pressure Transmitters.Initially Reported on 860321. Engineering Developing Design Mod Package (DM-86-140) Re Unit 1 Instrument Installations.Next Rept by 871202 +, TXX-6614, Advises That Completion Date for Implementation of Mods to Unit 1 Cable Tray Hangers (Cth) Revised to 871102,per Violation a Noted in Insp Rept 50-445/84-16.Completion Date for Unit 2 Cth Program Revised to 881031 +, TXX-6612 +, TXX-6595, Interim Deficiency Rept CP-85-42 Re Effect of Substitution of Rectangular & Oversized Preformed Sections of Thermolag on Conduit Installations.Initially Reported on 861026. Corrective Actions Being Implemented.Next Rept by 870911 +, TXX-6596, Revises 870112 Response to Violations Noted in Insp Repts 50-445/86-03 & 50-446/86-02.Nonconformance Rept M-80-00161 Re Authorization to Cut Single Layer of Concrete Reinforcing Steel Revised in Apr 1986 +, TXX-6546, Forwards Response to Notice of Deviation from Insp Repts 50-445/87-02 & 50-446/87-02.Corrective Action:Review of 10% of Total Population of Concrete Pours Performed & Cross Checked,Resulting in 26 Discrepancies +, TXX-6581, Interim Deficiency Rept CP-86-54 Re Design & Installation of Control Room Ceiling.Initially Reported on 861003.Resolution of Open QC Items Continuing.Next Rept Will Be Submitted by 870921 +, TXX-6476, Informs That FSAR Table 17A-1 Will Not Include safety- Related Masonry Walls or Supports But Will Include Nonseismic Masonry Walls to Document Interaction Evaluation Requirements,Per NRC 870311 Concerns +, TXX-6573, Interim Deficiency Rept CP-86-63 Re Pipe Support Const. Initially Reported on 861016.Procedure CP-QAP-12-1, Mechanical Component Installation Verification, Revised. Next Rept to Be Submitted by 870930 +, TXX-6568, Interim Deficiency Rept CP-86-82 Re Welds Used to Splice Cable Tray Hanger (Cth) Channel Sections.Initially Reported on 870106.As-built Verification Program for Cth Installations Complete.Next Rept to Be Submitted by 871120 +, TXX-6580, Amends 870601 Updated Response to Deviation Noted in Insp Repts 50-445/86-05,50-446/86-02,50-445/86-07 & 50-446/86-05. Closure of Nonconformance Rept CM-87-5721-N Delayed Until 870930 Due to Conflict W/Other Work in Same Location +, TXX-6575, Advises That Due to Issuance of 870619 Generic Ltr 87-11, Relaxation in Arbitrary Intermediate Pipe Rupture Requirements, Further Work in Area Suspended.Generic Ltr Will Eliminate Need to Respond to NRC Request for Addl Info +, TXX-6562, Responds to NRC Re Violations Noted in Insp Repts 50-445/86-26 & 50-446/86-22.Corrective Action:Nonconformance Rept E-86-1038835 & Const Deficiency Rept 87-4746EC Issued to Address Specific Pull Ropes & Cable Tray,Respectively +...
05000445  +  and 05000446  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
August 31, 1987  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
11:14:10, 2 December 2024  +
39  +
Processing error"Processing error" is a predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> and represents errors that appeared in connection with improper value annotations or input processing.
Request  +
August 31, 1987  +
TXX-6545, Advises That Util Evaluating Alternate Resolution Re Potential Zinc Embrittlement of Stainless Steel Tubing & walk-down Activities Suspended Pending Completion of Evaluation,Per 870414 Response to Notice of Violation +, TXX-6655, Provides Revised Response to Violation Noted in Insp Repts 50-445/85-14 & 50-446/85-11.Corrective Actions:Pipe Supports Returned from Operations to Engineering & Const Function to Establish Controls & Vital Drawings List Developed +, TXX-6625, Interim Deficiency Rept CP-85-19 Re Design Requirements & Documents for safety-related Plant Conduit & Conduit Supports.Initially Reported on 861021.Revised Calculation Based on Effective Thread Dimension.Next Rept by 871009 +, TXX-6659, Advises That Conversion of Previously Used Documents to Appropriate Corrective Action Documents Completed on 870702, Per Insp Repts 50-445/86-26 & 50-446/86-22 +, TXX-6615, Forwards Revs to Previously Submitted Manuals Describing Use of Comanche Peak Response Team Checklists +, TXX-6626, Final Deficiency Rept CP-87-17 Re Operation of Power Supplies Mfg by Validyne Engineering Corp.Initially Reported on 870608.Issue Not Reportable Under 10CFR50.55(e) +, TXX-6617, Interim Deficiency Rept CP-87-12 Re Containment Pressure/ Temp Analysis Computer Error.Initially Reported on 870612. Reanalysis of Main Steam Line Break Accident Completed.Next Rept Will Be Submitted by 871211 +, TXX-6613, Interim Deficiency Rept CP-86-04 Re Richmond Inserts to Embedded Plates & Welded Attachments to Embedded Plates. Initially Reported on 870213.Spacing Criteria Issues Resolved.Qc Instructions Added.Next Rept Expected by 871005 +, TXX-6620, Final Deficiency Rept CP-87-31 Re Diesel Generator Control Air Regulator.Initially Reported on 870706.No Deficiency Existed at Plant,Per Imo Delaval Part 21 Rept.Deficiency Not Reportable Under 10CFR50.55(e) +, TXX-6582, Forwards Table of Comments Not Included in Util 870815 Clarification of Fire Protection Program,Per Sser 12 (NUREG-0797).Fire Protection Program Review & Fire Hazards Analysis Incorporated Into Design Basis Documents.W/O Encl +, TXX-6479, Forwards Rev 1 to Large Bore Pipe Stress & Pipe Support Generic Issues Rept. All Future Revs Will Be Provided in Apps a & B of Large Bore Piping & Pipe Supports Project Status Rept +, TXX-6605, Forwards Addl Info Re Notice of Deviation,Item 2 from Insp Repts 50-445/86-08 & 50-446/86-06,per 870706 Meeting W/ Rf Warnick.Disagrees W/Alleged Deviation.Procedure CP-QAP-19.1 Not Required to Be Consistent W/Ansi N45.2.12 +, TXX-6622, Interim Deficiency Rept CP-86-35 Re Motor Operators for Valves in Main Steam Sys.Initially Reported on 860602. Corrective Action Implementation in Progress.Next Rept Anticipated No Later than 871002 +, TXX-6571, Forwards Description of Amend 64 to Fsar,Transmitted by .Amend Provides Updates,Additions & Editorial Changes as Well as Revised Effective Page Listing.Topics Included in Revs Listed.W/O Encl +, TXX-6570 +, TXX-6618, Interim Deficiency Rept CP-86-52 Re Splice/Connections Used for Cable Trays.Initially Reported on 860429.Evaluation Continuing.Next Rept Expected by 870903 +, TXX-6598, Forwards Wg Counsil to Nh Williams Transmitting Documents Requested by Cygna.M Malloy 870805 Release Memo Encl +, TXX-6606, Interim Deficiency Rept CP-86-19 Re Installation of Steam Svc Pressure Transmitters.Initially Reported on 860321. Engineering Developing Design Mod Package (DM-86-140) Re Unit 1 Instrument Installations.Next Rept by 871202 +, TXX-6614, Advises That Completion Date for Implementation of Mods to Unit 1 Cable Tray Hangers (Cth) Revised to 871102,per Violation a Noted in Insp Rept 50-445/84-16.Completion Date for Unit 2 Cth Program Revised to 881031 +, TXX-6612 +, TXX-6595, Interim Deficiency Rept CP-85-42 Re Effect of Substitution of Rectangular & Oversized Preformed Sections of Thermolag on Conduit Installations.Initially Reported on 861026. Corrective Actions Being Implemented.Next Rept by 870911 +, TXX-6596, Revises 870112 Response to Violations Noted in Insp Repts 50-445/86-03 & 50-446/86-02.Nonconformance Rept M-80-00161 Re Authorization to Cut Single Layer of Concrete Reinforcing Steel Revised in Apr 1986 +, TXX-6546, Forwards Response to Notice of Deviation from Insp Repts 50-445/87-02 & 50-446/87-02.Corrective Action:Review of 10% of Total Population of Concrete Pours Performed & Cross Checked,Resulting in 26 Discrepancies +, TXX-6581, Interim Deficiency Rept CP-86-54 Re Design & Installation of Control Room Ceiling.Initially Reported on 861003.Resolution of Open QC Items Continuing.Next Rept Will Be Submitted by 870921 +, TXX-6476, Informs That FSAR Table 17A-1 Will Not Include safety- Related Masonry Walls or Supports But Will Include Nonseismic Masonry Walls to Document Interaction Evaluation Requirements,Per NRC 870311 Concerns +, TXX-6573, Interim Deficiency Rept CP-86-63 Re Pipe Support Const. Initially Reported on 861016.Procedure CP-QAP-12-1, Mechanical Component Installation Verification, Revised. Next Rept to Be Submitted by 870930 +, TXX-6568, Interim Deficiency Rept CP-86-82 Re Welds Used to Splice Cable Tray Hanger (Cth) Channel Sections.Initially Reported on 870106.As-built Verification Program for Cth Installations Complete.Next Rept to Be Submitted by 871120 +, TXX-6580, Amends 870601 Updated Response to Deviation Noted in Insp Repts 50-445/86-05,50-446/86-02,50-445/86-07 & 50-446/86-05. Closure of Nonconformance Rept CM-87-5721-N Delayed Until 870930 Due to Conflict W/Other Work in Same Location +, TXX-6575, Advises That Due to Issuance of 870619 Generic Ltr 87-11, Relaxation in Arbitrary Intermediate Pipe Rupture Requirements, Further Work in Area Suspended.Generic Ltr Will Eliminate Need to Respond to NRC Request for Addl Info +, TXX-6562, Responds to NRC Re Violations Noted in Insp Repts 50-445/86-26 & 50-446/86-22.Corrective Action:Nonconformance Rept E-86-1038835 & Const Deficiency Rept 87-4746EC Issued to Address Specific Pull Ropes & Cable Tray,Respectively +...
Applicant Seventh Progress Rept.* Progress Provided for Period 870701-0825,per Board 860606 Memorandum & Order. Certificate of Svc Encl.Related Correspondence  +