ML20210B966 +
TXX-6360, Interim Deficiency Rept CP-84-12 Re Impact of High Energy Line Break Temps on Qualified Equipment Outside Containment. Initially Reported on 840604.Deficiency Under Evaluation. Next Rept Will Be Submitted by 870528 +, TXX-4762, Interim Deficiency Rept CP-86-07 Re Weld Failure & Coating Degradation in Svc Water Sys.Initially Reported on 860124. Connected Pipe Nipple Lengthened to Add Flexibility & Eliminate Stress Riser.Final Rept Expected by 860730 +, TXX-6332, Interim Deficiency Rept CP-86-19 Re Installation of Steam Svc Pressure Transmitters.Initially Reported on 860321. Program Implemented to Assure Proper Alignment & Torquing of Unistrut Nuts.Next Rept Will Be Submitted by 870731 +, TXX-6153, Interim Deficiency Rept CP-85-42 Re Adverse Effect of Rectangular Oversized Preformed Thermolag on Conduit Installations.Initially Reported on 861026.Conduits Evaluated & Corrective Action Initiated.Next Rept by 870428 +, TXX-6408, Interim Deficiency Rept CP-85-53 Re Seismic Category II Platforms.Initially Reported on 851220.Engineering,const & Quality Personnel Discussed Corrective Action.Comprehensive Plan Will Be Submitted.Next Rept by 870619 +, TXX-4824, Interim Deficiency Rept CP-86-19 Re Installation of Steam Svc Pressure Transmitters Above Root Valves W/O Steam Traps or Wet Legs.Initially Reported on 860321.Evaluation of Corrective Action & Next Rept Expected by 860730 +, TXX-6351 +, TXX-6105, Interim Deficiency Rept CP-86-32 Re Through Wall Embedded Conduit Sleeves.Initially Reported on 860421.Field Verification Procedure Issued to Obtain as-built Data. Next Response Anticipated by 870424 +, TXX-4975, Part 21 & Deficiency Rept CP-86-31 Re Failure of Rubber Facing on Diesel Generator Lube Oil Sump Tank Foot Valves. Initially Reported on 860418.Evaluation Continuing.New Liners Being Procured.Next Rept Will Be Submitted by 861126 +, TXX-6234, Interim Deficiency Rept CP-86-12 Re Attachments at or Near Design Gaps Between Secondary Walls & Adjacent Walls/Floors. Initially Reported on 860227.Evaluation Continuing.Next Rept Expected by 870327 +, TXX-6235, Interim Deficiency Rept CP-86-19 Re Installation of Steam Svc Pressure Transmitters.Initially Reported on 860321.Scope of Item Expanded to Include Corrective Actions for CP-86-77, CP-86-70 & CP-86-16.Next Rept Expected by 870320 +, TXX-6420, Interim Deficiency Rept CP-85-42 Re Thermolag on Conduit Support.Initially Reported on 861026.Util Continuing to Evaluate Adverse Effect of Substitution of Oversized Preformed Thermolag.Next Rept Expected by 870731 +, TXX-6246, Interim Deficiency Rept CP-85-53 Re Seismic Category II Platforms.Initially Reported on 851220.Reinsp & Subsequent Engineering Evaluation Initiated.Next Rept Expected by 870422 +, TXX-6404, Interim Deficiency Rept CP-86-32 Re Thru Wall Embedded Conduit Sleeves.Nonconformance Repts Issued to Document Deficiencies Identified During Collection of as-built Data. Next Rept Will Be Issued by 871030 +, TXX-6405, Interim Deficiency Rept CP-86-51 Re Hilti Anchor Bolts Which Do Not Meet Average Ultimate Tensile Loads in Certain Sizes as Published by Supplier.Initially Reported on 860717. Evaluation Continuing.Next Rept Expected by 870708 +, TXX-6231, Interim Deficiency Rept CP-86-13 Re Computer Entry Error Which May Invalidate Portions of Jet Impingement Load Review for High Energy Piping.Initially Reported on 860305.Next Rept Will Be Submitted by 870407 +, TXX-6179, Interim Deficiency Rept CP-84-12 Re Environ Qualification of Equipment Outside Containment for High Energy Line Breaks. Initially Reported on 840604.Affected Cables & Functions Identified.Next Rept to Be Submitted by 870410 +, TXX-6379, Interim Deficiency Rept CP-86-13 Re Computer Entry Error Which Could Invalidate Portions of Jet Impingement Load Review for High Energy Piping.Initially Reported on 860305. Next Rept Will Be Submitted by 870624 +, TXX-6362, Interim Deficiency Rept CP-86-12 Re Attachments At/Or in Close Proximity to Design Gaps Between Secondary & Adjacent Walls.Initially Reported on 860227.Evaluation of Commodities in Progress.Next Rept Will Be Submitted by 870603 +, TXX-6357, Interim Deficiency Rept CP-86-10 Re Electrical Penetration Assemblies (EPA) Supplied by Bunker Ramo.Initially Reported on 860424.EPA Modules Will Be Replaced by Modules Supplied by Conax.Next Rept Will Be Submitted by 870710 +, TXX-6358, Interim Deficiency Rept CP-86-36 Re Scope of Plant Mods Resulting from Pipe Support Reverification Program.Initially Reported on 860609.Deficiency Under Evaluation to Identify Addl Reportable Instances.Next Rept Expected by 870612 +, TXX-6348, Interim Deficiency Rept CP-86-07 Re Svc Water Sys Leakage. Initially Reported on 860411.Pipe Coating Insp Completed on Accessible Piping in Train a Svc Water Sys W/Coating Repairs Implemented on Problem Areas.Next Rept Expected by 870715 +, TXX-6335, Interim Deficiency Rept CP-86-31 Re Possible Failure of Rubber Facing on Foot Valves Mounted in Diesel Generator Lube Oil Sump Tank.Initially Reported on 860822.Rubber Facings in Process of Replacement.Next Rept by 870713 +, TXX-6343, Interim Deficiency Rept CP-86-51 Re Overstated Tensile Strengths of Hilti Kwik Bolts.Initially Reported on 860717. Hilti Isolated Problem to Specific Bolt Size.Info Notice 86-094 Cited Correction.Next Rept Due by 870424 +, TXX-5044, Interim Deficiency Rept CP-86-10 Re Bunker Ramo Electrical Penetration Assemblies.Initially Reported on 860424.Bunker Ramo Modules to Be Replaced by Conax Modules by 870525.Next Rept Will Be Submitted by 870427 +, TXX-4774, Interim Significant Deficiency Rept CP-86-10 Re Bunker Ramo Electrical Penetration Assemblies Not in Accordance W/Design Requirements.Initially Reported on 860214.Modules Replaced. Final Rept Will Be Submitted by 860611 + and TXX-6049, Interim Deficiency Rept CP-85-42 Re Adverse Effects of Substituting Sections of Thermolags on Conduit Supports. Initially Reported on 850920.Analysis of Conduits,Supports & Appurtenances Continuing.Next Rept Expected by 861215 +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
ML20210B966 +, ML20210B966 +, ML20210B966 +, ML20210B966 +, ML20210B966 +, ML20210B966 +, ML20210B966 +, ML20210B966 +, ML20210B966 +, ML20210B966 +, ML20210B966 +, ML20210B966 +, ML20210B966 +, ML20210B966 + and ML20210B966 +
April 30, 1987 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
21:55:56, 6 December 2024 +
37 +
Request +
April 30, 1987 +
Service water + and Main Steam +
TXX-6360, Interim Deficiency Rept CP-84-12 Re Impact of High Energy Line Break Temps on Qualified Equipment Outside Containment. Initially Reported on 840604.Deficiency Under Evaluation. Next Rept Will Be Submitted by 870528 +, TXX-4762, Interim Deficiency Rept CP-86-07 Re Weld Failure & Coating Degradation in Svc Water Sys.Initially Reported on 860124. Connected Pipe Nipple Lengthened to Add Flexibility & Eliminate Stress Riser.Final Rept Expected by 860730 +, TXX-6332, Interim Deficiency Rept CP-86-19 Re Installation of Steam Svc Pressure Transmitters.Initially Reported on 860321. Program Implemented to Assure Proper Alignment & Torquing of Unistrut Nuts.Next Rept Will Be Submitted by 870731 +, TXX-6153, Interim Deficiency Rept CP-85-42 Re Adverse Effect of Rectangular Oversized Preformed Thermolag on Conduit Installations.Initially Reported on 861026.Conduits Evaluated & Corrective Action Initiated.Next Rept by 870428 +, TXX-6408, Interim Deficiency Rept CP-85-53 Re Seismic Category II Platforms.Initially Reported on 851220.Engineering,const & Quality Personnel Discussed Corrective Action.Comprehensive Plan Will Be Submitted.Next Rept by 870619 +, TXX-4824, Interim Deficiency Rept CP-86-19 Re Installation of Steam Svc Pressure Transmitters Above Root Valves W/O Steam Traps or Wet Legs.Initially Reported on 860321.Evaluation of Corrective Action & Next Rept Expected by 860730 +, TXX-6351 +, TXX-6105, Interim Deficiency Rept CP-86-32 Re Through Wall Embedded Conduit Sleeves.Initially Reported on 860421.Field Verification Procedure Issued to Obtain as-built Data. Next Response Anticipated by 870424 +, TXX-4975, Part 21 & Deficiency Rept CP-86-31 Re Failure of Rubber Facing on Diesel Generator Lube Oil Sump Tank Foot Valves. Initially Reported on 860418.Evaluation Continuing.New Liners Being Procured.Next Rept Will Be Submitted by 861126 +, TXX-6234, Interim Deficiency Rept CP-86-12 Re Attachments at or Near Design Gaps Between Secondary Walls & Adjacent Walls/Floors. Initially Reported on 860227.Evaluation Continuing.Next Rept Expected by 870327 +, TXX-6235, Interim Deficiency Rept CP-86-19 Re Installation of Steam Svc Pressure Transmitters.Initially Reported on 860321.Scope of Item Expanded to Include Corrective Actions for CP-86-77, CP-86-70 & CP-86-16.Next Rept Expected by 870320 +, TXX-6420, Interim Deficiency Rept CP-85-42 Re Thermolag on Conduit Support.Initially Reported on 861026.Util Continuing to Evaluate Adverse Effect of Substitution of Oversized Preformed Thermolag.Next Rept Expected by 870731 +, TXX-6246, Interim Deficiency Rept CP-85-53 Re Seismic Category II Platforms.Initially Reported on 851220.Reinsp & Subsequent Engineering Evaluation Initiated.Next Rept Expected by 870422 +, TXX-6404, Interim Deficiency Rept CP-86-32 Re Thru Wall Embedded Conduit Sleeves.Nonconformance Repts Issued to Document Deficiencies Identified During Collection of as-built Data. Next Rept Will Be Issued by 871030 +, TXX-6405, Interim Deficiency Rept CP-86-51 Re Hilti Anchor Bolts Which Do Not Meet Average Ultimate Tensile Loads in Certain Sizes as Published by Supplier.Initially Reported on 860717. Evaluation Continuing.Next Rept Expected by 870708 +, TXX-6231, Interim Deficiency Rept CP-86-13 Re Computer Entry Error Which May Invalidate Portions of Jet Impingement Load Review for High Energy Piping.Initially Reported on 860305.Next Rept Will Be Submitted by 870407 +, TXX-6179, Interim Deficiency Rept CP-84-12 Re Environ Qualification of Equipment Outside Containment for High Energy Line Breaks. Initially Reported on 840604.Affected Cables & Functions Identified.Next Rept to Be Submitted by 870410 +, TXX-6379, Interim Deficiency Rept CP-86-13 Re Computer Entry Error Which Could Invalidate Portions of Jet Impingement Load Review for High Energy Piping.Initially Reported on 860305. Next Rept Will Be Submitted by 870624 +, TXX-6362, Interim Deficiency Rept CP-86-12 Re Attachments At/Or in Close Proximity to Design Gaps Between Secondary & Adjacent Walls.Initially Reported on 860227.Evaluation of Commodities in Progress.Next Rept Will Be Submitted by 870603 +, TXX-6357, Interim Deficiency Rept CP-86-10 Re Electrical Penetration Assemblies (EPA) Supplied by Bunker Ramo.Initially Reported on 860424.EPA Modules Will Be Replaced by Modules Supplied by Conax.Next Rept Will Be Submitted by 870710 +, TXX-6358, Interim Deficiency Rept CP-86-36 Re Scope of Plant Mods Resulting from Pipe Support Reverification Program.Initially Reported on 860609.Deficiency Under Evaluation to Identify Addl Reportable Instances.Next Rept Expected by 870612 +, TXX-6348, Interim Deficiency Rept CP-86-07 Re Svc Water Sys Leakage. Initially Reported on 860411.Pipe Coating Insp Completed on Accessible Piping in Train a Svc Water Sys W/Coating Repairs Implemented on Problem Areas.Next Rept Expected by 870715 +, TXX-6335, Interim Deficiency Rept CP-86-31 Re Possible Failure of Rubber Facing on Foot Valves Mounted in Diesel Generator Lube Oil Sump Tank.Initially Reported on 860822.Rubber Facings in Process of Replacement.Next Rept by 870713 +, TXX-6343, Interim Deficiency Rept CP-86-51 Re Overstated Tensile Strengths of Hilti Kwik Bolts.Initially Reported on 860717. Hilti Isolated Problem to Specific Bolt Size.Info Notice 86-094 Cited Correction.Next Rept Due by 870424 +, TXX-5044, Interim Deficiency Rept CP-86-10 Re Bunker Ramo Electrical Penetration Assemblies.Initially Reported on 860424.Bunker Ramo Modules to Be Replaced by Conax Modules by 870525.Next Rept Will Be Submitted by 870427 +, TXX-4774, Interim Significant Deficiency Rept CP-86-10 Re Bunker Ramo Electrical Penetration Assemblies Not in Accordance W/Design Requirements.Initially Reported on 860214.Modules Replaced. Final Rept Will Be Submitted by 860611 + and TXX-6049, Interim Deficiency Rept CP-85-42 Re Adverse Effects of Substituting Sections of Thermolags on Conduit Supports. Initially Reported on 850920.Analysis of Conduits,Supports & Appurtenances Continuing.Next Rept Expected by 861215 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.