The following is a summary of information The following is a summary of information provided by the licensee via phone and email:</br>On November 18, 2025, at 0328 CST, as the licensee was initiating the standby gas treatment system in support of planned maintenance on normal reactor building ventilation, the '2A' reactor enclosure recirculation system (RERS) fan failed to establish flow upon the system initiation signal. The '2B' RERS fan was previously inoperable due to a planned maintenance window. Technical specification action statement 3.6.5.4.B was entered with both Unit 2 RERS fans inoperable. The '2B' RERS fan was restored to operable at 0523 EST. The licensee returned normal reactor building ventilation to service to restore secondary containment differential pressure.</br>Due to inoperability of both RERS trains, the system was in a condition that could have prevented the fulfillment of a safety function; therefore, this condition is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72.(b)(3)(v)(C).</br>The licensee reported there was no impact to the health and safety of the public or plant personnel. The NRC Resident Inspector was notified.. The NRC Resident Inspector was notified.  +
08:28:00, 19 November 2025  +
11:19:00, 19 November 2025  +
08:28:00, 19 November 2025  +
The following is a summary of information The following is a summary of information provided by the licensee via phone and email:</br>On November 18, 2025, at 0328 CST, as the licensee was initiating the standby gas treatment system in support of planned maintenance on normal reactor building ventilation, the '2A' reactor enclosure recirculation system (RERS) fan failed to establish flow upon the system initiation signal. The '2B' RERS fan was previously inoperable due to a planned maintenance window. Technical specification action statement 3.6.5.4.B was entered with both Unit 2 RERS fans inoperable. The '2B' RERS fan was restored to operable at 0523 EST. The licensee returned normal reactor building ventilation to service to restore secondary containment differential pressure.</br>Due to inoperability of both RERS trains, the system was in a condition that could have prevented the fulfillment of a safety function; therefore, this condition is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72.(b)(3)(v)(C).</br>The licensee reported there was no impact to the health and safety of the public or plant personnel. The NRC Resident Inspector was notified.. The NRC Resident Inspector was notified.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 19 November 2025  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
12:20:07, 21 November 2025  +
11:19:00, 19 November 2025  +
false  +
0.119 d (2.85 hours, 0.017 weeks, 0.0039 months)  +
08:28:00, 19 November 2025  +
Loss of Reactor Enclosure Recirculation  +