The following is a synopsis of informationThe following is a synopsis of information provided by Curtiss-Wright via email:</br>On January 7, 2025, Rosemount notified Curtiss-Wright Middleburg Heights regarding Generation 3 quick disconnect connectors (QDCs) with no connection on at least one wire, with the bad connection not favoring one specific wire. Rosemount identified five Generation 3 QDCs out of 122 tested, where the issue is specifically in the continuity of the wires. All Generation 3 QDCs from the order are currently on hold at Rosemount and have not been shipped to any customer.</br>On January 9, 2025, Rosemount sent Curtiss-Wright two of the five questionable Generation 3 QDCs. Curtiss-Wright performed an initial evaluation to confirm the issue. The results were initially confirmed, but with minor manipulation the Generation 3 QDCs no longer showed negative results. Curtiss-Wright and Rosemount have agreed to send all the questionable Generation 3 QDCs to an outside testing entity to help perform a failure analysis to assist in determining the root cause. </br>Curtiss-Wright anticipates completing the evaluation by Tuesday, May 6, 2025.</br>There are no known plants affected.</br>Contact Information:</br>Tim Franchuk</br>Curtiss-Wright Nuclear Division</br>Director of Quality Assurance</br>(513) 201-2176</br>tfranchuk@curtisswright.com</br>* * * UPDATE ON 05/06/25 AT 1351 EDT FROM MARGIE HOVER TO JOSUE RAMIREZ * * *</br>Curtiss-Wright has completed their evaluation of the deviation described in their interim report submitted to the NRC on March 12, 2025. Curtiss-Wright concluded that the deviation does not constitute a reportable defect. The occurrence was isolated to the Generation 3 quick disconnect connectors (QDCs) provided to Rosemount on a specific order. All questionable Generation 3 QDCs have been scrapped by Rosemount and were not provided to any utility.</br>Notified R3DO (Ruiz) and Part 21 Group (Email)fied R3DO (Ruiz) and Part 21 Group (Email)  +
04:00:00, 7 January 2025  +
13:15:00, 12 March 2025  +
04:00:00, 7 January 2025  +
The following is a synopsis of informationThe following is a synopsis of information provided by Curtiss-Wright via email:</br>On January 7, 2025, Rosemount notified Curtiss-Wright Middleburg Heights regarding Generation 3 quick disconnect connectors (QDCs) with no connection on at least one wire, with the bad connection not favoring one specific wire. Rosemount identified five Generation 3 QDCs out of 122 tested, where the issue is specifically in the continuity of the wires. All Generation 3 QDCs from the order are currently on hold at Rosemount and have not been shipped to any customer.</br>On January 9, 2025, Rosemount sent Curtiss-Wright two of the five questionable Generation 3 QDCs. Curtiss-Wright performed an initial evaluation to confirm the issue. The results were initially confirmed, but with minor manipulation the Generation 3 QDCs no longer showed negative results. Curtiss-Wright and Rosemount have agreed to send all the questionable Generation 3 QDCs to an outside testing entity to help perform a failure analysis to assist in determining the root cause. </br>Curtiss-Wright anticipates completing the evaluation by Tuesday, May 6, 2025.</br>There are no known plants affected.</br>Contact Information:</br>Tim Franchuk</br>Curtiss-Wright Nuclear Division</br>Director of Quality Assurance</br>(513) 201-2176</br>tfranchuk@curtisswright.com</br>* * * UPDATE ON 05/06/25 AT 1351 EDT FROM MARGIE HOVER TO JOSUE RAMIREZ * * *</br>Curtiss-Wright has completed their evaluation of the deviation described in their interim report submitted to the NRC on March 12, 2025. Curtiss-Wright concluded that the deviation does not constitute a reportable defect. The occurrence was isolated to the Generation 3 quick disconnect connectors (QDCs) provided to Rosemount on a specific order. All questionable Generation 3 QDCs have been scrapped by Rosemount and were not provided to any utility.</br>Notified R3DO (Ruiz) and Part 21 Group (Email)fied R3DO (Ruiz) and Part 21 Group (Email)  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 6 May 2025  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
12:21:13, 1 January 2026  +
13:15:00, 12 March 2025  +
64.427 d (1,546.25 hours, 9.204 weeks, 2.118 months)  +
04:00:00, 7 January 2025  +
Part 21 Interim Report of Deviation  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.