The following information was provided by The following information was provided by the licensee via email:</br>At 0651 EDT on April 5, 2023, with Unit 1 in mode 1 at 85 percent power, the reactor was manually tripped due to loss of main feedwater pump 'C'. The trip was not complex, with all systems responding normally post-trip. Main feedwater pump 'B' had previously been removed from service in preparation for a planned shutdown as a part of refueling outage RF27.</br>Operations responded and stabilized the plant. Decay heat is being removed by the emergency feedwater system.</br>Due to the reactor protection system actuation while critical, this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72(b)(2)(iv)(B) and an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(iv)(A) resulting from valid actuation of the reactor protection and emergency feedwater systems. </br>There was no impact on the health and safety of the public or plant personnel.</br>The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:</br>The licensee continues to investigate the loss of main feedwater pump 'C'.</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector.  +
10:51:00, 5 April 2023  +
10:25:00, 5 April 2023  +
10:51:00, 5 April 2023  +
The following information was provided by The following information was provided by the licensee via email:</br>At 0651 EDT on April 5, 2023, with Unit 1 in mode 1 at 85 percent power, the reactor was manually tripped due to loss of main feedwater pump 'C'. The trip was not complex, with all systems responding normally post-trip. Main feedwater pump 'B' had previously been removed from service in preparation for a planned shutdown as a part of refueling outage RF27.</br>Operations responded and stabilized the plant. Decay heat is being removed by the emergency feedwater system.</br>Due to the reactor protection system actuation while critical, this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72(b)(2)(iv)(B) and an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(iv)(A) resulting from valid actuation of the reactor protection and emergency feedwater systems. </br>There was no impact on the health and safety of the public or plant personnel.</br>The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:</br>The licensee continues to investigate the loss of main feedwater pump 'C'.</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 5 April 2023  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
19:59:00, 4 January 2024  +
10:25:00, 5 April 2023  +
-0.0179 d (-0.43 hours, -0.00256 weeks, -5.89014e-4 months)  +
10:51:00, 5 April 2023  +
Manual Reactor Trip  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +