Browse wiki

Jump to navigation Jump to search
EN Revision Imported Date : 10/12/2020 LOSEN Revision Imported Date : 10/12/2020</br>LOSS OF TECHNICAL SUPPORT CENTER VENTILATION SYSTEM DUE TO PLANNED MAINTENANCE:</br>This is an eight-hour, non-emergency notification for a loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the planned maintenance affects the functionality of an emergency response facility. Planned maintenance activities are being performed on 09/28/20 to the Peach Bottom Atomic Power Station (PBAPS) Technical Support Center (TSC) HVAC. The work includes replacement of supply fan and roof-top unit. Work is scheduled to complete on 10/11/20.</br>If an emergency is declared requiring PBAPS TSC activation during this period, the PBAPS TSC will be staffed and activated using existing Emergency Preparedness (EP) procedures. If the PBAPS TS becomes uninhabitable due to radiological, or other conditions, the TSC Station Emergency Director will relocate the TSC staff to an alternate location in accordance with EP procedures. The Emergency Response Organization team has been notified of the maintenance and the possible need to relocate during an emergency.</br>The NRC Resident Inspector will be notified by the licensee.</br>* * * UPDATE ON 10/9/20 AT 1234 EDT FROM BRIAN BAILEY TO ANDREW WAUGH * * *</br>An eight-hour, non-emergency notification for a loss of Emergency Assessment Capability was made on 9/28/20 under Event Notification 54917 for planned maintenance activities to the Peach Bottom Atomic Power Station (PBAPS) Technical Support Center (TSC) ventilation system. This event was reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the planned maintenance affected the functionality of an emergency response facility.</br>This update to EN 54917 is to notify applicable stakeholders that, following satisfactory completion of the planned supply fan and roof-top unit replacement work, the PBAPS TSC ventilation system has been returned to service with no remaining work or outstanding deficiencies related to this work.</br>The licensee has notified the NRC Resident Inspector. Notified R1DO (Lally).Resident Inspector. Notified R1DO (Lally).  
09:00:00, 28 September 2020  +
54,917  +
05:02:00, 28 September 2020  +
09:00:00, 28 September 2020  +
EN Revision Imported Date : 10/12/2020 LOSEN Revision Imported Date : 10/12/2020</br>LOSS OF TECHNICAL SUPPORT CENTER VENTILATION SYSTEM DUE TO PLANNED MAINTENANCE:</br>This is an eight-hour, non-emergency notification for a loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the planned maintenance affects the functionality of an emergency response facility. Planned maintenance activities are being performed on 09/28/20 to the Peach Bottom Atomic Power Station (PBAPS) Technical Support Center (TSC) HVAC. The work includes replacement of supply fan and roof-top unit. Work is scheduled to complete on 10/11/20.</br>If an emergency is declared requiring PBAPS TSC activation during this period, the PBAPS TSC will be staffed and activated using existing Emergency Preparedness (EP) procedures. If the PBAPS TS becomes uninhabitable due to radiological, or other conditions, the TSC Station Emergency Director will relocate the TSC staff to an alternate location in accordance with EP procedures. The Emergency Response Organization team has been notified of the maintenance and the possible need to relocate during an emergency.</br>The NRC Resident Inspector will be notified by the licensee.</br>* * * UPDATE ON 10/9/20 AT 1234 EDT FROM BRIAN BAILEY TO ANDREW WAUGH * * *</br>An eight-hour, non-emergency notification for a loss of Emergency Assessment Capability was made on 9/28/20 under Event Notification 54917 for planned maintenance activities to the Peach Bottom Atomic Power Station (PBAPS) Technical Support Center (TSC) ventilation system. This event was reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the planned maintenance affected the functionality of an emergency response facility.</br>This update to EN 54917 is to notify applicable stakeholders that, following satisfactory completion of the planned supply fan and roof-top unit replacement work, the PBAPS TSC ventilation system has been returned to service with no remaining work or outstanding deficiencies related to this work.</br>The licensee has notified the NRC Resident Inspector. Notified R1DO (Lally).Resident Inspector. Notified R1DO (Lally).  
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 9 October 2020  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
16:16:43, 15 January 2021  +
05:02:00, 28 September 2020  +
-0.165 d (-3.97 hours, -0.0236 weeks, -0.00544 months)  +
09:00:00, 28 September 2020  +
<td align="Left" scope="Row">  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
2  +  and 3  +