100  +
At 0952 EST on 01/17/2018 with Unit 1 and At 0952 EST on 01/17/2018 with Unit 1 and Unit 2 operating at 100 percent, the normal supply breaker to the Unit 1J Emergency Bus tripped open due to an under-voltage condition when the potential transformer fuses were inadvertently disconnected. This resulted in a loss of power to the Unit 1J Emergency Bus from its normal off-site power supply. Number 3 Emergency Diesel Generator automatically started on an under-voltage signal and loaded onto the Unit 1J Emergency Bus, as designed.</br>All equipment performed as expected during the event and there were no unexplained occurrences. Maintenance has verified the fuses have been reconnected and at 1221 EST, off-site power was restored to Unit 1J Emergency Bus. At 1254 EST Number 3 Emergency Diesel Generator was secured in accordance with Station Operating procedures.</br>All Electrical distribution systems have been restored to a normal alignment.</br>There were no radiation releases due to this event, nor were there any personnel injuries or contamination events.</br>This event is being reported in accordance with 10 CFR 50.72(b)(3)(iv)(A) due to the auto start of Number 3 Emergency Diesel Generator.</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector.  +
14:52:00, 17 January 2018  +
53,170  +
15:08:00, 17 January 2018  +
14:52:00, 17 January 2018  +
At 0952 EST on 01/17/2018 with Unit 1 and At 0952 EST on 01/17/2018 with Unit 1 and Unit 2 operating at 100 percent, the normal supply breaker to the Unit 1J Emergency Bus tripped open due to an under-voltage condition when the potential transformer fuses were inadvertently disconnected. This resulted in a loss of power to the Unit 1J Emergency Bus from its normal off-site power supply. Number 3 Emergency Diesel Generator automatically started on an under-voltage signal and loaded onto the Unit 1J Emergency Bus, as designed.</br>All equipment performed as expected during the event and there were no unexplained occurrences. Maintenance has verified the fuses have been reconnected and at 1221 EST, off-site power was restored to Unit 1J Emergency Bus. At 1254 EST Number 3 Emergency Diesel Generator was secured in accordance with Station Operating procedures.</br>All Electrical distribution systems have been restored to a normal alignment.</br>There were no radiation releases due to this event, nor were there any personnel injuries or contamination events.</br>This event is being reported in accordance with 10 CFR 50.72(b)(3)(iv)(A) due to the auto start of Number 3 Emergency Diesel Generator.</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100  +
00:00:00, 17 January 2018  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
01:41:09, 2 March 2018  +
15:08:00, 17 January 2018  +
false  +
0.0113 d (0.27 hours, 0.00161 weeks, 3.69846e-4 months)  +
14:52:00, 17 January 2018  +
Auto-Start of Emergency Diesel Generator Due to Transformer Fuses Being Disconnected  +