Browse wiki

Jump to navigation Jump to search
On October 18th, 2016, the logarithmic chaOn October 18th, 2016, the logarithmic channel was rendered inoperable when a ground wire became detached from the log pre-amp. This, in combination with the pre-amps close proximity to other electrical wires, created enough noise to make the log channel reading unreliable. The reactor was operated for over an hour before the malfunction was identified. At that point, the reactor was scrammed and secured. The compromised ground was discovered and replaced, and the pre-amp was placed on a platform away from the interference of the other electrical components. This log channel reading returned to normal, but operations were still suspended until the channel could be more thoroughly tested. A Corrective Action Report (CAR) was initiated. This is a violation of Technical Specifications 3.2.2, 3.2.3 and 4.2(e). This report to the NRC Operations Center is required by Technical Specification 6.2.2.</br>The licensee has notified the NRC Project Manager (Wertz). notified the NRC Project Manager (Wertz).  +
22:35:00, 18 October 2016  +
16:27:00, 19 October 2016  +
22:35:00, 18 October 2016  +
On October 18th, 2016, the logarithmic chaOn October 18th, 2016, the logarithmic channel was rendered inoperable when a ground wire became detached from the log pre-amp. This, in combination with the pre-amps close proximity to other electrical wires, created enough noise to make the log channel reading unreliable. The reactor was operated for over an hour before the malfunction was identified. At that point, the reactor was scrammed and secured. The compromised ground was discovered and replaced, and the pre-amp was placed on a platform away from the interference of the other electrical components. This log channel reading returned to normal, but operations were still suspended until the channel could be more thoroughly tested. A Corrective Action Report (CAR) was initiated. This is a violation of Technical Specifications 3.2.2, 3.2.3 and 4.2(e). This report to the NRC Operations Center is required by Technical Specification 6.2.2.</br>The licensee has notified the NRC Project Manager (Wertz). notified the NRC Project Manager (Wertz).  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 19 October 2016  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:16:06, 24 September 2017  +
16:27:00, 19 October 2016  +
0.745 d (17.87 hours, 0.106 weeks, 0.0245 months)  +
22:35:00, 18 October 2016  +
Technical Specification Violation  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.