At 1600 (EDT) on May 31, 2015, (DC Cook) o … At 1600 (EDT) on May 31, 2015, (DC Cook) operations commenced a shutdown of DC Cook Unit 1 to comply with LCO 3.8.1 Condition G, when the 14 day limit to complete Condition B Required Action could not be met.</br>At 0010 (EDT) on May 18, 2015, Unit 1 AB Emergency Diesel Generator was removed from service for planned maintenance. LCO 3.8.1 Condition B was entered which allows 14 days to restore diesel to operable.</br>At 1049 (EDT) on May 21, 2015, Unit 1 AB Emergency Diesel Generator tripped during post maintenance testing due to high bearing temperatures. Subsequent actions to repair and restore the diesel to operable status have been unsuccessful.</br>This event is reportable under 10 CFR 50.72(b)(2)(i), the initiation of any nuclear plant shutdown required by the plant's Technical Specifications, as a four (4) hour report. The DC Cook Sr. Resident NRC Inspector has been notified.</br>Unit 1 is expected to be in Mode 5 by 2030 EDT on June 1, 2015. There is no impact on Unit 2.</br>* * * UPDATE FROM CHRIS PEAK TO JOHN SHOEMAKER ON 6/1/15 AT 1704 EDT * * *</br>This update is to correct the information contained in the block titled 'Power/Mode After'. The power and mode after the event requiring notification (TECHNICAL SPECIFICATION REQUIRED SHUTDOWN DUE TO INABILITY TO RESTORE UNIT 1 AB EDG WITHIN THE COMPLETION TIME PRESCRIBED IN LCO 3.8.1 CONDITION B) was 99% power and mode 1.</br>The licensee has notified the NRC Resident Inspector.</br>D.C. Cook Unit 1 is currently in Mode 3 and conducting a normal cooldown to Mode 4.</br>Notified R3DO (Passehl).</br>* * * UPDATE FROM CHRIS PEAK TO HOWIE CROUCH AT 0734 EDT ON 6/2/15 * * *</br>DC Cook Unit 1 reactor was shut down (Mode 3) at 0231 hours (EDT) June 01, 2015 and achieved Mode 5 at 0410 hours (EDT) June 02, 2015 to comply with LCO 3.8.1 Condition G with all systems operating normally.</br>The licensee has notified the NRC Resident Inspector.</br>Notified R3DO (Passehl).sident Inspector.
Notified R3DO (Passehl). +
20:00:00, 31 May 2015 +
16:32:00, 31 May 2015 +
20:00:00, 31 May 2015 +
At 1600 (EDT) on May 31, 2015, (DC Cook) o … At 1600 (EDT) on May 31, 2015, (DC Cook) operations commenced a shutdown of DC Cook Unit 1 to comply with LCO 3.8.1 Condition G, when the 14 day limit to complete Condition B Required Action could not be met.</br>At 0010 (EDT) on May 18, 2015, Unit 1 AB Emergency Diesel Generator was removed from service for planned maintenance. LCO 3.8.1 Condition B was entered which allows 14 days to restore diesel to operable.</br>At 1049 (EDT) on May 21, 2015, Unit 1 AB Emergency Diesel Generator tripped during post maintenance testing due to high bearing temperatures. Subsequent actions to repair and restore the diesel to operable status have been unsuccessful.</br>This event is reportable under 10 CFR 50.72(b)(2)(i), the initiation of any nuclear plant shutdown required by the plant's Technical Specifications, as a four (4) hour report. The DC Cook Sr. Resident NRC Inspector has been notified.</br>Unit 1 is expected to be in Mode 5 by 2030 EDT on June 1, 2015. There is no impact on Unit 2.</br>* * * UPDATE FROM CHRIS PEAK TO JOHN SHOEMAKER ON 6/1/15 AT 1704 EDT * * *</br>This update is to correct the information contained in the block titled 'Power/Mode After'. The power and mode after the event requiring notification (TECHNICAL SPECIFICATION REQUIRED SHUTDOWN DUE TO INABILITY TO RESTORE UNIT 1 AB EDG WITHIN THE COMPLETION TIME PRESCRIBED IN LCO 3.8.1 CONDITION B) was 99% power and mode 1.</br>The licensee has notified the NRC Resident Inspector.</br>D.C. Cook Unit 1 is currently in Mode 3 and conducting a normal cooldown to Mode 4.</br>Notified R3DO (Passehl).</br>* * * UPDATE FROM CHRIS PEAK TO HOWIE CROUCH AT 0734 EDT ON 6/2/15 * * *</br>DC Cook Unit 1 reactor was shut down (Mode 3) at 0231 hours (EDT) June 01, 2015 and achieved Mode 5 at 0410 hours (EDT) June 02, 2015 to comply with LCO 3.8.1 Condition G with all systems operating normally.</br>The licensee has notified the NRC Resident Inspector.</br>Notified R3DO (Passehl).sident Inspector.
Notified R3DO (Passehl). +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100 +
00:00:00, 2 June 2015 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
01:47:37, 2 March 2018 +
16:32:00, 31 May 2015 +
true +
false +
-0.145 d (-3.47 hours, -0.0207 weeks, -0.00475 months) +
20:00:00, 31 May 2015 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.