Browse wiki
Jump to navigation
Jump to search
100 +
This notification is conservatively being … This notification is conservatively being made in accordance with 10 CFR 50.72(b)(3)(xiii) as an event that will result in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g. significant portion of control room indication, Emergency Notification System or offsite notification system.)</br>The emergency preparedness plan requires seismic monitoring instruments to diagnose an earthquake for emergency action levels (EAL) HU6 (Natural or destructive phenomena affecting PROTECTED AREA) and HA6 (Natural and destructive phenomena affecting VITAL AREAS).</br>At approximately 1600 (CDT) on May 1, 2015, ANO plans to remove Motor Control Center B33 from service for maintenance. This will render the alarm functions for the seismic monitors nonfunctional. It is expected that this maintenance will take approximately 72 hours to complete. ANO procedures provide compensatory measures of using offsite sources to obtain seismic data.</br>The NRC Resident Inspector has been notified. NRC Resident Inspector has been notified. +
21:00:00, 1 May 2015 +
51,029 +
16:14:00, 1 May 2015 +
21:00:00, 1 May 2015 +
This notification is conservatively being … This notification is conservatively being made in accordance with 10 CFR 50.72(b)(3)(xiii) as an event that will result in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g. significant portion of control room indication, Emergency Notification System or offsite notification system.)</br>The emergency preparedness plan requires seismic monitoring instruments to diagnose an earthquake for emergency action levels (EAL) HU6 (Natural or destructive phenomena affecting PROTECTED AREA) and HA6 (Natural and destructive phenomena affecting VITAL AREAS).</br>At approximately 1600 (CDT) on May 1, 2015, ANO plans to remove Motor Control Center B33 from service for maintenance. This will render the alarm functions for the seismic monitors nonfunctional. It is expected that this maintenance will take approximately 72 hours to complete. ANO procedures provide compensatory measures of using offsite sources to obtain seismic data.</br>The NRC Resident Inspector has been notified. NRC Resident Inspector has been notified. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100 +
00:00:00, 1 May 2015 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
01:47:51, 2 March 2018 +
16:14:00, 1 May 2015 +
true +
false +
-0.199 d (-4.77 hours, -0.0284 weeks, -0.00653 months) +
21:00:00, 1 May 2015 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.