Browse wiki

Jump to navigation Jump to search
The following information was received froThe following information was received from the Commonwealth of Pennsylvania via fax:</br>Notifications: This was originally reported to the NMED within 30-days per 10 CFR 34.101 (a)(2) on May 5, 2011 and was assigned NMED Number 110278; however, after further evaluation it was determined it should have also been reported under 10 CFR 30.50 which requires immediate reporting.</br>Event Description: TEI Analytical Services was performing gamma radiography of pipe welds at its facility in Washington, PA. During the first exposure, the radiography source assembly was unable to be retracted to its shielded position due to excessive bend in the guide tube. When retraction of the source was attempted resistance was encountered within 1/4 turn of full retraction. The source was returned to the collimator and a second attempt was made to retract the source. Again, resistance was encountered at the same location. Additional attempts to retract the source were terminated and the RSO was notified.</br>Equipment information: </br> Exposure Device: Make: Source Production and Equipment Company</br> Device Model: SPEC-150</br> Serial #:0418</br> Date Quarterly Inspection/Maintenance performed: 03/08/2011 </br> Sealed Source: Isotope: Ir-192</br> Make: Source Production and Equipment Company</br> Model: G-60</br> Serial #: SB2506 .</br> Activity: 105 Ci (3885 GBq)</br>Cause of the Event: Exceeding the maximum 6 (inch) radius bend for guide tube. A longer tube would have prevented the event.</br>Actions: The device was operated by the RSO to retract the source conventionally and the resistance was significant. The RSO made one entry to the area to lower the stand height; thereby, decreasing the radius of the guide tube. Total time for the entry was 11 seconds including walking to the stand from the shieldwall and return. Time to lower stand was 2 seconds. The source was cranked back into the device and the event was terminated. The equipment was disassembled and inspected by the RSO. No physical damage was evident to the guide tube, or to the external/internal materials of the guide tube.</br>PA Event Report ID No. PA110010uide tube. PA Event Report ID No. PA110010  
05:00:00, 5 April 2011  +
49,853  +
08:56:00, 25 February 2014  +
05:00:00, 5 April 2011  +
The following information was received froThe following information was received from the Commonwealth of Pennsylvania via fax:</br>Notifications: This was originally reported to the NMED within 30-days per 10 CFR 34.101 (a)(2) on May 5, 2011 and was assigned NMED Number 110278; however, after further evaluation it was determined it should have also been reported under 10 CFR 30.50 which requires immediate reporting.</br>Event Description: TEI Analytical Services was performing gamma radiography of pipe welds at its facility in Washington, PA. During the first exposure, the radiography source assembly was unable to be retracted to its shielded position due to excessive bend in the guide tube. When retraction of the source was attempted resistance was encountered within 1/4 turn of full retraction. The source was returned to the collimator and a second attempt was made to retract the source. Again, resistance was encountered at the same location. Additional attempts to retract the source were terminated and the RSO was notified.</br>Equipment information: </br> Exposure Device: Make: Source Production and Equipment Company</br> Device Model: SPEC-150</br> Serial #:0418</br> Date Quarterly Inspection/Maintenance performed: 03/08/2011 </br> Sealed Source: Isotope: Ir-192</br> Make: Source Production and Equipment Company</br> Model: G-60</br> Serial #: SB2506 .</br> Activity: 105 Ci (3885 GBq)</br>Cause of the Event: Exceeding the maximum 6 (inch) radius bend for guide tube. A longer tube would have prevented the event.</br>Actions: The device was operated by the RSO to retract the source conventionally and the resistance was significant. The RSO made one entry to the area to lower the stand height; thereby, decreasing the radius of the guide tube. Total time for the entry was 11 seconds including walking to the stand from the shieldwall and return. Time to lower stand was 2 seconds. The source was cranked back into the device and the event was terminated. The equipment was disassembled and inspected by the RSO. No physical damage was evident to the guide tube, or to the external/internal materials of the guide tube.</br>PA Event Report ID No. PA110010uide tube. PA Event Report ID No. PA110010  
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 25 February 2014  +
PA-1164  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
23:09:52, 24 November 2018  +
08:56:00, 25 February 2014  +
1,057.122 d (25,370.93 hours, 151.017 weeks, 34.753 months)  +
05:00:00, 5 April 2011  +
Agreement State Report - Radiography Source Fails to Retract  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.