Browse wiki

Jump to navigation Jump to search
At 1553 CST on November 30, 2013, during tAt 1553 CST on November 30, 2013, during the performance of the High Pressure Coolant Injection (HPCI) fast initiation test, HPCI did not produce the required flow rate as specified by Technical Specification Surveillance Requirement 3.5.1.6. The HPCI subsystem is designed to ensure adequate core cooling when operated with other available Emergency Core Cooling Systems (ECCS), and during this event, all other ECCS systems remained operable. The cause of this event is currently under investigation.</br>This event is being reported in accordance with 10 CFR 50.72(b)(3)(v)(D) as a condition that could have prevented the fulfillment of the safety function of structures or systems needed to mitigate the consequences of an accident.</br>The NRC Resident Inspector has been notified.</br>The flow rate achieved during the test was 3000 gpm and the required minimum flow rate is 5000 gpm.he required minimum flow rate is 5000 gpm.  +
21:53:00, 30 November 2013  +
49,591  +
22:43:00, 30 November 2013  +
21:53:00, 30 November 2013  +
At 1553 CST on November 30, 2013, during tAt 1553 CST on November 30, 2013, during the performance of the High Pressure Coolant Injection (HPCI) fast initiation test, HPCI did not produce the required flow rate as specified by Technical Specification Surveillance Requirement 3.5.1.6. The HPCI subsystem is designed to ensure adequate core cooling when operated with other available Emergency Core Cooling Systems (ECCS), and during this event, all other ECCS systems remained operable. The cause of this event is currently under investigation.</br>This event is being reported in accordance with 10 CFR 50.72(b)(3)(v)(D) as a condition that could have prevented the fulfillment of the safety function of structures or systems needed to mitigate the consequences of an accident.</br>The NRC Resident Inspector has been notified.</br>The flow rate achieved during the test was 3000 gpm and the required minimum flow rate is 5000 gpm.he required minimum flow rate is 5000 gpm.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 30 November 2013  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:21:18, 24 September 2017  +
22:43:00, 30 November 2013  +
false  +
0.0346 d (0.83 hours, 0.00494 weeks, 0.00114 months)  +
21:53:00, 30 November 2013  +
High Pressure Coolant Injection System Surveillance Test Failure  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
2  +