Browse wiki
Jump to navigation
Jump to search
This is a non-emergency eight hour notific … This is a non-emergency eight hour notification for a loss of Emergency Assessment Capability. This event is reportable in accordance with 10CFR50.72(b)(3)(xiii) because the work activity affects the functionality of an emergency response facility.</br>Planned maintenance activities are being performed on 09/04/13 to the Technical Support Center (TSC) HVAC. The work includes performance of planned outside air intake valve electrical repair. The planned work activity duration is approximately 12 hours.</br>If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures unless the TSC becomes uninhabitable due to ambient temperature, radiological, or other conditions. If relocation of the TSC becomes necessary, the Emergency Director will relocate the TSC staff to an alternate location in accordance with applicable site procedures. The Emergency Response Organization team has been notified of the maintenance and the possible need to relocate during an emergency.</br>The NRC Resident Inspector has been notified. This event poses no threat to the public or station employees.threat to the public or station employees. +
08:05:00, 4 September 2013 +
49,319 +
04:13:00, 4 September 2013 +
08:05:00, 4 September 2013 +
This is a non-emergency eight hour notific … This is a non-emergency eight hour notification for a loss of Emergency Assessment Capability. This event is reportable in accordance with 10CFR50.72(b)(3)(xiii) because the work activity affects the functionality of an emergency response facility.</br>Planned maintenance activities are being performed on 09/04/13 to the Technical Support Center (TSC) HVAC. The work includes performance of planned outside air intake valve electrical repair. The planned work activity duration is approximately 12 hours.</br>If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures unless the TSC becomes uninhabitable due to ambient temperature, radiological, or other conditions. If relocation of the TSC becomes necessary, the Emergency Director will relocate the TSC staff to an alternate location in accordance with applicable site procedures. The Emergency Response Organization team has been notified of the maintenance and the possible need to relocate during an emergency.</br>The NRC Resident Inspector has been notified. This event poses no threat to the public or station employees.threat to the public or station employees. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 4 September 2013 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:00:08, 2 March 2018 +
04:13:00, 4 September 2013 +
true +
false +
-0.161 d (-3.87 hours, -0.023 weeks, -0.0053 months) +
08:05:00, 4 September 2013 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.