At 0406 (EDT) on April 4, 2013, the Fermi … At 0406 (EDT) on April 4, 2013, the Fermi 2 Integrated Plant Computer System (IPCS) failed. This resulted in a loss of approximately 60 percent of data on the Safety Parameters Display System (SPDS).</br>While IPCS and SPDS are not fully functional, the Emergency Plan can still be implemented if a plant emergency does occur, as assessment capabilities are available under alternate means.</br>Investigation is in progress. A follow up message will be made when IPCS and SPDS are restored to fully functional status.</br>This notification is being made per the requirements of 8 Hour Non-Emergency Notification 10CFR50.72(b)(3)(xiii), any event that results in a major loss of emergency assessment capability.</br>The licensee has notified the NRC Resident Inspector.</br>* * * UPDATE FROM GREG MILLER TO VINCE KLCO AT 1636 EDT ON 4/5/2013 * * *</br>At 1627 (EDT) on April 4, 2013, plant personnel were able to restore full functionality of IPCS and SPDS. This restored full assessment capabilities to all onsite emergency response faculties.</br>The licensee notified the NRC Resident Inspector.</br>Notified the R3DO (Daley).dent Inspector.
Notified the R3DO (Daley). +
08:06:00, 4 April 2013 +
08:35:00, 4 April 2013 +
08:06:00, 4 April 2013 +
At 0406 (EDT) on April 4, 2013, the Fermi … At 0406 (EDT) on April 4, 2013, the Fermi 2 Integrated Plant Computer System (IPCS) failed. This resulted in a loss of approximately 60 percent of data on the Safety Parameters Display System (SPDS).</br>While IPCS and SPDS are not fully functional, the Emergency Plan can still be implemented if a plant emergency does occur, as assessment capabilities are available under alternate means.</br>Investigation is in progress. A follow up message will be made when IPCS and SPDS are restored to fully functional status.</br>This notification is being made per the requirements of 8 Hour Non-Emergency Notification 10CFR50.72(b)(3)(xiii), any event that results in a major loss of emergency assessment capability.</br>The licensee has notified the NRC Resident Inspector.</br>* * * UPDATE FROM GREG MILLER TO VINCE KLCO AT 1636 EDT ON 4/5/2013 * * *</br>At 1627 (EDT) on April 4, 2013, plant personnel were able to restore full functionality of IPCS and SPDS. This restored full assessment capabilities to all onsite emergency response faculties.</br>The licensee notified the NRC Resident Inspector.</br>Notified the R3DO (Daley).dent Inspector.
Notified the R3DO (Daley). +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
65 +
00:00:00, 5 April 2013 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:01:23, 2 March 2018 +
08:35:00, 4 April 2013 +
true +
false +
0.02 d (0.48 hours, 0.00286 weeks, 6.57504e-4 months) +
08:06:00, 4 April 2013 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.