At approximately 0830 EDT on 5/3/12, prepl … At approximately 0830 EDT on 5/3/12, preplanned maintenance will be performed on the Technical Support Center (TSC) ventilation system. This maintenance will be performed for TSC Fan OA-2 for a motor replacement. This maintenance is planned to be performed and completed within 8 hours. If an emergency condition should occur that would require evacuation of the TSC, the Harris Nuclear Plant (HNP) emergency plan has procedural guidance for use of an alternate location.</br>This event is reportable per 10 CFR 50.72(b)(3)(xiii) as described in NUREG-1022, Rev. 2 since this work activity affects an emergency response facility for the duration of the maintenance.</br>The licensee notified the NRC Resident Inspector.</br>* * * UPDATE FROM TIM ENGLISH TO DONALD NORWOOD AT 1713 EDT ON 5/3/2012 * * *</br>Maintenance work has been completed and the TSC is considered operable as of 1713 EDT.</br>The licensee notified the NRC Resident Inspector. Notified R2DO (Seymour).ident Inspector. Notified R2DO (Seymour). +
12:30:00, 3 May 2012 +
47,894 +
07:59:00, 3 May 2012 +
12:30:00, 3 May 2012 +
At approximately 0830 EDT on 5/3/12, prepl … At approximately 0830 EDT on 5/3/12, preplanned maintenance will be performed on the Technical Support Center (TSC) ventilation system. This maintenance will be performed for TSC Fan OA-2 for a motor replacement. This maintenance is planned to be performed and completed within 8 hours. If an emergency condition should occur that would require evacuation of the TSC, the Harris Nuclear Plant (HNP) emergency plan has procedural guidance for use of an alternate location.</br>This event is reportable per 10 CFR 50.72(b)(3)(xiii) as described in NUREG-1022, Rev. 2 since this work activity affects an emergency response facility for the duration of the maintenance.</br>The licensee notified the NRC Resident Inspector.</br>* * * UPDATE FROM TIM ENGLISH TO DONALD NORWOOD AT 1713 EDT ON 5/3/2012 * * *</br>Maintenance work has been completed and the TSC is considered operable as of 1713 EDT.</br>The licensee notified the NRC Resident Inspector. Notified R2DO (Seymour).ident Inspector. Notified R2DO (Seymour). +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 3 May 2012 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:04:15, 2 March 2018 +
07:59:00, 3 May 2012 +
false +
false +
-0.188 d (-4.52 hours, -0.0269 weeks, -0.00619 months) +
12:30:00, 3 May 2012 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.