Browse wiki
Jump to navigation
Jump to search
During a GNF-A Fuel Manufacturing Operatio … During a GNF-A Fuel Manufacturing Operation (FMO) Integrated Safety Analysis (ISA) team walk-down of HVAC systems in the decontamination facility area, it was observed that a log entry for a waste-oil can mass was greater than the limit specified in procedural requirements.</br>Upon further investigation it was determined at 3:30PM on September 14, 2011 that an operator had incorrectly processed a waste oil can with a gross weight in excess of the limit specified by criticality safety requirements. This resulted in a condition where one of the two controls on mass documented as being necessary to meet double contingency had not been maintained. The second criticality control on mass was maintained at all times.</br>At no time was an unsafe condition present, however the decontamination oil processing area was shut down until necessary controls were available.</br>This event is being conservatively reported pursuant to GNF-A internal procedure reporting requirements within 24 hours of discovery.</br>The licensee will inform the state and local agencies and the NRC Region II Office of this incident.</br>* * * UPDATE FROM SCOTT MURRAY TO DONALD NORWOOD AT 1832 EDT ON 9/16/2011 * * *</br>The incorrect processing of the waste oil can as reported on 9/15/11 resulted in a failure to meet the performance requirement of 10CFR70.61 and as a result, met the reporting requirements of 10CFR70 Appendix A(b)(2) (and 10CFR70.74).</br>Notified R2DO (Guthrie) and NMSS EO (McCartin).</br>* * * UPDATE AT 1100 EDT ON 09/23/11 FROM SCOTT MURRAY TO S. SANDIN * * *</br>An extent of condition review has identified two additional cans that were improperly processed with a gross weight over the 9.58 kg gross weight limit specified in procedural requirements.</br>March 2, 2011 9.66 kg</br>July 13, 2009 9.65 kg</br>At no time was an unsafe condition present. The decontamination oil processing area remains shutdown.</br>Notified R2DO (Lesser) and NMSS (Benner).
Notified R2DO (Lesser) and NMSS (Benner). +
19:30:00, 14 September 2011 +
47,269 +
14:45:00, 15 September 2011 +
19:30:00, 14 September 2011 +
During a GNF-A Fuel Manufacturing Operatio … During a GNF-A Fuel Manufacturing Operation (FMO) Integrated Safety Analysis (ISA) team walk-down of HVAC systems in the decontamination facility area, it was observed that a log entry for a waste-oil can mass was greater than the limit specified in procedural requirements.</br>Upon further investigation it was determined at 3:30PM on September 14, 2011 that an operator had incorrectly processed a waste oil can with a gross weight in excess of the limit specified by criticality safety requirements. This resulted in a condition where one of the two controls on mass documented as being necessary to meet double contingency had not been maintained. The second criticality control on mass was maintained at all times.</br>At no time was an unsafe condition present, however the decontamination oil processing area was shut down until necessary controls were available.</br>This event is being conservatively reported pursuant to GNF-A internal procedure reporting requirements within 24 hours of discovery.</br>The licensee will inform the state and local agencies and the NRC Region II Office of this incident.</br>* * * UPDATE FROM SCOTT MURRAY TO DONALD NORWOOD AT 1832 EDT ON 9/16/2011 * * *</br>The incorrect processing of the waste oil can as reported on 9/15/11 resulted in a failure to meet the performance requirement of 10CFR70.61 and as a result, met the reporting requirements of 10CFR70 Appendix A(b)(2) (and 10CFR70.74).</br>Notified R2DO (Guthrie) and NMSS EO (McCartin).</br>* * * UPDATE AT 1100 EDT ON 09/23/11 FROM SCOTT MURRAY TO S. SANDIN * * *</br>An extent of condition review has identified two additional cans that were improperly processed with a gross weight over the 9.58 kg gross weight limit specified in procedural requirements.</br>March 2, 2011 9.66 kg</br>July 13, 2009 9.65 kg</br>At no time was an unsafe condition present. The decontamination oil processing area remains shutdown.</br>Notified R2DO (Lesser) and NMSS (Benner).
Notified R2DO (Lesser) and NMSS (Benner). +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 23 September 2011 +
SNM-1097 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
23:18:52, 24 November 2018 +
14:45:00, 15 September 2011 +
0.802 d (19.25 hours, 0.115 weeks, 0.0264 months) +
19:30:00, 14 September 2011 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.