At 1929 EDT, both off-site A.C. power sour … At 1929 EDT, both off-site A.C. power sources to Sequoyah were declared inoperable due to the effects of inclement weather on the TVA transmission system. This determination was made after a review of grid conditions confirmed that pre-analyzed grid/offsite power requirements could not be met. Both Sequoyah Units have entered TS LCO 3.8.1.1, action d, for two inoperable offsite power sources. It has not been determined when this condition will no longer exist.</br>Although inoperable, off-site A.C. sources remain connected to Sequoyah; emergency diesel generators are not running nor required to be at this time.</br>T.S. LCO 3.8.1.1, action d, requires verifying EDG operability within 8 hours and restoration of both offsite power sources within 24 hours or placing both Units in mode 3. </br>The licensee informed the NRC Resident Inspector.</br> * * * UPDATE FROM JEFF EPPERSON TO PETE SNYDER AT 0203 EDT ON 4/28/11 * * * </br>As of 0119 EDT the licensee has two operable offsite power sources qualified through transmission and reliability analysis. The licensee exited their LCO Condition. The grid condition is now yellow. </br>Notified R2IRC (Gody).ion is now yellow.
Notified R2IRC (Gody). +
23:29:00, 27 April 2011 +
20:19:00, 27 April 2011 +
23:29:00, 27 April 2011 +
At 1929 EDT, both off-site A.C. power sour … At 1929 EDT, both off-site A.C. power sources to Sequoyah were declared inoperable due to the effects of inclement weather on the TVA transmission system. This determination was made after a review of grid conditions confirmed that pre-analyzed grid/offsite power requirements could not be met. Both Sequoyah Units have entered TS LCO 3.8.1.1, action d, for two inoperable offsite power sources. It has not been determined when this condition will no longer exist.</br>Although inoperable, off-site A.C. sources remain connected to Sequoyah; emergency diesel generators are not running nor required to be at this time.</br>T.S. LCO 3.8.1.1, action d, requires verifying EDG operability within 8 hours and restoration of both offsite power sources within 24 hours or placing both Units in mode 3. </br>The licensee informed the NRC Resident Inspector.</br> * * * UPDATE FROM JEFF EPPERSON TO PETE SNYDER AT 0203 EDT ON 4/28/11 * * * </br>As of 0119 EDT the licensee has two operable offsite power sources qualified through transmission and reliability analysis. The licensee exited their LCO Condition. The grid condition is now yellow. </br>Notified R2IRC (Gody).ion is now yellow.
Notified R2IRC (Gody). +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 28 April 2011 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:07:21, 2 March 2018 +
20:19:00, 27 April 2011 +
true +
false +
-0.132 d (-3.17 hours, -0.0189 weeks, -0.00434 months) +
23:29:00, 27 April 2011 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.