Browse wiki

Jump to navigation Jump to search
This event is being reported in accordanceThis event is being reported in accordance with 10 CFR 50.72(b)(3)(iv)(A), an event or condition that resulted in a valid actuation of emergency AC electrical power systems.</br>At 0104 EDT on November 5, 2010, the plant was in Mode 5 Cold Shutdown in a refueling outage. Maintenance personnel were performing post maintenance testing on the main generator relay panel when the 'B-SB' Safety Bus was inadvertently de-energized, resulting in automatic starting of the 'B-SB' Emergency Diesel Generator. Safety systems responded as expected during the event, and the 'A-SA' Emergency Bus remained operable with power available from both offsite power and the 'A-SA' Emergency Diesel Generator throughout the event. The 'B-SB' Safety Bus was powering shutdown cooling, which was restored using 'B-SB' Residual Heat Removal system at 0107 EDT with the 'B-SB' Emergency Diesel Generator supplying the bus. The testing procedure was not intended to result in the safety bus being de-energized nor automatic start of the Emergency Diesel Generator. Although the specific cause of the safety bus being de-energized is not known at the present time, it appears that it was directly related to the testing being performed.</br>The licensee notified the NRC Resident Inspector.</br>The 'B-SB' Safety Bus has been returned to its normal offsite power source and the 'B-SB' Emergency Diesel Generator secured and returned to standby status.or secured and returned to standby status.  +
05:04:00, 5 November 2010  +
46,396  +
06:50:00, 5 November 2010  +
05:04:00, 5 November 2010  +
This event is being reported in accordanceThis event is being reported in accordance with 10 CFR 50.72(b)(3)(iv)(A), an event or condition that resulted in a valid actuation of emergency AC electrical power systems.</br>At 0104 EDT on November 5, 2010, the plant was in Mode 5 Cold Shutdown in a refueling outage. Maintenance personnel were performing post maintenance testing on the main generator relay panel when the 'B-SB' Safety Bus was inadvertently de-energized, resulting in automatic starting of the 'B-SB' Emergency Diesel Generator. Safety systems responded as expected during the event, and the 'A-SA' Emergency Bus remained operable with power available from both offsite power and the 'A-SA' Emergency Diesel Generator throughout the event. The 'B-SB' Safety Bus was powering shutdown cooling, which was restored using 'B-SB' Residual Heat Removal system at 0107 EDT with the 'B-SB' Emergency Diesel Generator supplying the bus. The testing procedure was not intended to result in the safety bus being de-energized nor automatic start of the Emergency Diesel Generator. Although the specific cause of the safety bus being de-energized is not known at the present time, it appears that it was directly related to the testing being performed.</br>The licensee notified the NRC Resident Inspector.</br>The 'B-SB' Safety Bus has been returned to its normal offsite power source and the 'B-SB' Emergency Diesel Generator secured and returned to standby status.or secured and returned to standby status.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 5 November 2010  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:08:29, 2 March 2018  +
06:50:00, 5 November 2010  +
false  +
false  +
0.0738 d (1.77 hours, 0.0105 weeks, 0.00242 months)  +
05:04:00, 5 November 2010  +
Valid Actuation of an Emergency Diesel Generator Following Inadvertent De-Energization of Safety Bus  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +