Browse wiki

Jump to navigation Jump to search
At 0826 EST, Millstone Unit 2 declared a NAt 0826 EST, Millstone Unit 2 declared a NOUE, due to a loss of power to the control room main board annunciators. Power was lost to the non-vital power supply, VR-11&21, during heater drain pump post maintenance testing, which caused the loss of power to the main control board annunciators. Charging and letdown systems are secured. Additional watchstanders were stationed during the annunciator outage. Power was restored to the main control board, and the licensee is in the process of terminating the NOUE. The NRC remained in Normal Mode. </br>The NRC Senior Resident Inspector has been notified. The State of Connecticut has been notified.</br>* * * NOTIFIED BY BRIEN STRIZZI TO DONG PARK AT 0922 EST ON 11/15/09 * * * </br>Millstone Unit 2 terminated the NOUE at 0859 EST after power was restored to the main control board annunciator. </br>Notified R1DO (Cahill), R1RA (Roberts), IRD MOC (Grant), NRR ET (Boger), NRR EO (Bahadur). </br>The NRC Senior Resident Inspector has been notified. The State of Connecticut has been notified as well as DHS and FEMA.cut has been notified as well as DHS and FEMA.  +
13:26:00, 15 November 2009  +
08:57:00, 15 November 2009  +
13:26:00, 15 November 2009  +
At 0826 EST, Millstone Unit 2 declared a NAt 0826 EST, Millstone Unit 2 declared a NOUE, due to a loss of power to the control room main board annunciators. Power was lost to the non-vital power supply, VR-11&21, during heater drain pump post maintenance testing, which caused the loss of power to the main control board annunciators. Charging and letdown systems are secured. Additional watchstanders were stationed during the annunciator outage. Power was restored to the main control board, and the licensee is in the process of terminating the NOUE. The NRC remained in Normal Mode. </br>The NRC Senior Resident Inspector has been notified. The State of Connecticut has been notified.</br>* * * NOTIFIED BY BRIEN STRIZZI TO DONG PARK AT 0922 EST ON 11/15/09 * * * </br>Millstone Unit 2 terminated the NOUE at 0859 EST after power was restored to the main control board annunciator. </br>Notified R1DO (Cahill), R1RA (Roberts), IRD MOC (Grant), NRR ET (Boger), NRR EO (Bahadur). </br>The NRC Senior Resident Inspector has been notified. The State of Connecticut has been notified as well as DHS and FEMA.cut has been notified as well as DHS and FEMA.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 15 November 2009  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:10:51, 2 March 2018  +
08:57:00, 15 November 2009  +
false  +
-0.187 d (-4.48 hours, -0.0267 weeks, -0.00614 months)  +
13:26:00, 15 November 2009  +
Unit 2 Declared an Unusual Event Due to a Loss of Annunciators  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
2  +