Voluntary Report of Planned Manual Plant S … Voluntary Report of Planned Manual Plant Shutdown. At 1802 on September 1, 2008, River Bend Station (RBS) completed a planned manual shutdown of the unit. This shutdown was determined to be necessary based on the conditions of the grid due to Hurricane Gustav. Evaluation of grid conditions determined that removing the unit from power operation would improve the reliability of the grid and thus the decision was made to shutdown. Offsite power was declared inoperable at 1520 on September 1 based on notification of grid status by the grid operator. It is expected that offsite power will be restored to an operable status within the 24 hour LCO Required Action Completion Time. In addition, damage to turbine building siding was reported. Assessment of this condition is being conducted. RBS had previously activated the Outage Control Center prior to the arrival of Hurricane Gustav. Additional resources are available on site to respond to plant conditions. A comprehensive assessment of the condition of the plant and other site facilities will be completed prior to restart. At this time, a schedule for restart has not been established.</br>The licensee contacted the NRC Resident Inspector.nsee contacted the NRC Resident Inspector. +
23:02:00, 1 September 2008 +
23:33:00, 1 September 2008 +
23:02:00, 1 September 2008 +
Voluntary Report of Planned Manual Plant S … Voluntary Report of Planned Manual Plant Shutdown. At 1802 on September 1, 2008, River Bend Station (RBS) completed a planned manual shutdown of the unit. This shutdown was determined to be necessary based on the conditions of the grid due to Hurricane Gustav. Evaluation of grid conditions determined that removing the unit from power operation would improve the reliability of the grid and thus the decision was made to shutdown. Offsite power was declared inoperable at 1520 on September 1 based on notification of grid status by the grid operator. It is expected that offsite power will be restored to an operable status within the 24 hour LCO Required Action Completion Time. In addition, damage to turbine building siding was reported. Assessment of this condition is being conducted. RBS had previously activated the Outage Control Center prior to the arrival of Hurricane Gustav. Additional resources are available on site to respond to plant conditions. A comprehensive assessment of the condition of the plant and other site facilities will be completed prior to restart. At this time, a schedule for restart has not been established.</br>The licensee contacted the NRC Resident Inspector.nsee contacted the NRC Resident Inspector. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
27 +
00:00:00, 1 September 2008 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:13:43, 2 March 2018 +
23:33:00, 1 September 2008 +
true +
true +
0.0217 d (0.52 hours, 0.0031 weeks, 7.12296e-4 months) +
23:02:00, 1 September 2008 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.