At approximately 2244 on September 26, 200 … At approximately 2244 on September 26, 2007 an unplanned reactor scram occurred. An Average Power Range Monitor (APRM) surveillance was being performed at the time. This surveillance should not have caused a full scram and the cause of the scram is under investigation. The plant responded to the scram as expected, all control rods fully inserted, and there is no need for emergency injection system operation. Critical parameters are being maintained within prescribed bands and the plant has been stabilized. A level 3 signal was received during this scram which would have caused an isolation but all affected valves were already in the closed position. </br>This event is being reported in accordance with 10CFR50.72(b)(2)(iv)(B) as an event that results in activation of the reactor protection system with the reactor critical.</br>All emergency systems are available and in standby mode. </br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector. +
03:44:00, 27 September 2007 +
43,668 +
03:48:00, 27 September 2007 +
03:44:00, 27 September 2007 +
At approximately 2244 on September 26, 200 … At approximately 2244 on September 26, 2007 an unplanned reactor scram occurred. An Average Power Range Monitor (APRM) surveillance was being performed at the time. This surveillance should not have caused a full scram and the cause of the scram is under investigation. The plant responded to the scram as expected, all control rods fully inserted, and there is no need for emergency injection system operation. Critical parameters are being maintained within prescribed bands and the plant has been stabilized. A level 3 signal was received during this scram which would have caused an isolation but all affected valves were already in the closed position. </br>This event is being reported in accordance with 10CFR50.72(b)(2)(iv)(B) as an event that results in activation of the reactor protection system with the reactor critical.</br>All emergency systems are available and in standby mode. </br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100 +
00:00:00, 27 September 2007 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:15:53, 2 March 2018 +
03:48:00, 27 September 2007 +
true +
0.00292 d (0.07 hours, 4.166667e-4 weeks, 9.5886e-5 months) +
03:44:00, 27 September 2007 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.