Browse wiki

Jump to navigation Jump to search
During performance HPCI Pump Operability (During performance HPCI Pump Operability (34SV-E41-002-1), HPCI Steam Supply Valve (1E41-F001) failed to open. When steam supply valve control switch was taken to open position, double indication was observed; however, HPCI turbine speed did not increase. Shortly afterward, HPCI Valve overload alarm was received. When steam supply control switch was taken to close position, a ground indication was received. The steam supply valve breaker tripped and ground indication cleared. Personnel in the field reported that the steam supply valve motor was hot to the touch.</br>All other required safety systems are operable and available. The electrical power system is in a normal configuration with no power sources unavailable. </br>The licensee will notify the NRC Resident Inspector.ee will notify the NRC Resident Inspector.  +
09:32:00, 8 February 2007  +
43,153  +
05:25:00, 8 February 2007  +
09:32:00, 8 February 2007  +
During performance HPCI Pump Operability (During performance HPCI Pump Operability (34SV-E41-002-1), HPCI Steam Supply Valve (1E41-F001) failed to open. When steam supply valve control switch was taken to open position, double indication was observed; however, HPCI turbine speed did not increase. Shortly afterward, HPCI Valve overload alarm was received. When steam supply control switch was taken to close position, a ground indication was received. The steam supply valve breaker tripped and ground indication cleared. Personnel in the field reported that the steam supply valve motor was hot to the touch.</br>All other required safety systems are operable and available. The electrical power system is in a normal configuration with no power sources unavailable. </br>The licensee will notify the NRC Resident Inspector.ee will notify the NRC Resident Inspector.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 8 February 2007  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:37:18, 24 September 2017  +
05:25:00, 8 February 2007  +
false  +
-0.172 d (-4.12 hours, -0.0245 weeks, -0.00564 months)  +
09:32:00, 8 February 2007  +
High Pressure Coolant Injection (Hpci) System Inoperable  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +