Browse wiki
Jump to navigation
Jump to search
{{#Regex_clear:On November 8, 2006, at app … {{#Regex_clear:On November 8, 2006, at approximately 11:06 Central Standard Time (CST) a valid actuation of Fort Calhoun station (FCS) Unit 1 Emergency Diesel Generator 2 (DG-2) occurred as a result of undervoltage on its respective safety bus (1A4). DG-2 started as a result from manually deenergizing bus 1A4 during the performance of the Bus Ground Fault Locator Function Test. The DG-2 output breaker was disabled as part of the test and therefore did not close onto the bus. The procedure was deficient in ensuring that DG-2 was not in automatic.</br>No loads were being supplied from Bus 1A4 at the time and thus no loads were lost. No other Safeguards systems or equipment were actuated.</br>Fort Calhoun Station is currently in a refueling outage, Mode 5 with the core offloaded to the Spent Fuel Pool. No Technical Specifications were entered as a result of this actuation due to plant being less than 300�F.</br>Emergency Diesel Generator 2 was taken out of automatic, lockout relays reset and the engine was shutdown.</br>The licensee notified the NRC Resident Inspector. }}ee notified the NRC Resident Inspector. }} +
17:06:00, 8 November 2006 +
14:30:00, 8 November 2006 +
17:06:00, 8 November 2006 +
{{#Regex_clear:On November 8, 2006, at app … {{#Regex_clear:On November 8, 2006, at approximately 11:06 Central Standard Time (CST) a valid actuation of Fort Calhoun station (FCS) Unit 1 Emergency Diesel Generator 2 (DG-2) occurred as a result of undervoltage on its respective safety bus (1A4). DG-2 started as a result from manually deenergizing bus 1A4 during the performance of the Bus Ground Fault Locator Function Test. The DG-2 output breaker was disabled as part of the test and therefore did not close onto the bus. The procedure was deficient in ensuring that DG-2 was not in automatic.</br>No loads were being supplied from Bus 1A4 at the time and thus no loads were lost. No other Safeguards systems or equipment were actuated.</br>Fort Calhoun Station is currently in a refueling outage, Mode 5 with the core offloaded to the Spent Fuel Pool. No Technical Specifications were entered as a result of this actuation due to plant being less than 300�F.</br>Emergency Diesel Generator 2 was taken out of automatic, lockout relays reset and the engine was shutdown.</br>The licensee notified the NRC Resident Inspector. }}ee notified the NRC Resident Inspector. }} +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 8 November 2006 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:37:47, 24 September 2017 +
14:30:00, 8 November 2006 +
false +
false +
-0.108 d (-2.6 hours, -0.0155 weeks, -0.00356 months) +
17:06:00, 8 November 2006 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.