Browse wiki

Jump to navigation Jump to search
100  +
FPL Energy Seabrook Station has discoveredFPL Energy Seabrook Station has discovered that a condition existed that was prohibited by the Technical Specifications. The Train B Containment Building Spray Pump (CBS) was inoperable for a period of time longer than permitted by the Technical Specifications. A failed relay driver board would have prevented the Train B CBS pump from automatically starting in response to high containment pressure. Following an LOP coincident with a high containment pressure, the initial start signal from the Train B EDG emergency power sequencer would not have initiated a CBS pump start, but an automatic start signal generated at a later time in the LOP sequence would have started the pump. The failed relay driver board only inhibited automatic starting of the Train B CBS pump. The Train B EDG remained capable of providing power to other Train B loads including the automatic start of the CBS pump at the later sequence. </br>This event is being reported in accordance with Seabrook Station Operating License condition 2.G as a failure to operate the facility in accordance with the Technical Specifications.</br>The licensee discovered the condition during surveillance testing and the condition has been repaired.</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector.  +
14:17:00, 7 July 2005  +
41,824  +
12:51:00, 7 July 2005  +
14:17:00, 7 July 2005  +
FPL Energy Seabrook Station has discoveredFPL Energy Seabrook Station has discovered that a condition existed that was prohibited by the Technical Specifications. The Train B Containment Building Spray Pump (CBS) was inoperable for a period of time longer than permitted by the Technical Specifications. A failed relay driver board would have prevented the Train B CBS pump from automatically starting in response to high containment pressure. Following an LOP coincident with a high containment pressure, the initial start signal from the Train B EDG emergency power sequencer would not have initiated a CBS pump start, but an automatic start signal generated at a later time in the LOP sequence would have started the pump. The failed relay driver board only inhibited automatic starting of the Train B CBS pump. The Train B EDG remained capable of providing power to other Train B loads including the automatic start of the CBS pump at the later sequence. </br>This event is being reported in accordance with Seabrook Station Operating License condition 2.G as a failure to operate the facility in accordance with the Technical Specifications.</br>The licensee discovered the condition during surveillance testing and the condition has been repaired.</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100  +
00:00:00, 7 July 2005  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:20:39, 2 March 2018  +
12:51:00, 7 July 2005  +
false  +
-0.0596 d (-1.43 hours, -0.00851 weeks, -0.00196 months)  +
14:17:00, 7 July 2005  +
License Condition Report Due to Exceeding Technical Specification Inoperability Time  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +