At 1515 hours on April 15, 2005, while conAt 1515 hours on April 15, 2005, while conducting excess flow check valve testing in conjunction with a reactor vessel pressure test during a scheduled refueling outage, Unit 1 received an invalid Anticipated Transient Without Scram (ATWS) Channel A trip signal and invalid reactor Lo-Lo water level trips on the A and C channels for ECCS. The operating Reactor Recirculation pump (1 A) tripped and both Emergency Diesel Generators (Unit 1 and Unit 0) auto-started and ran unloaded. RCIC received an initiation signal, which resulted in proper valve repositioning for the system but no injection due to the steam supply being isolated to support the reactor vessel pressure test. In addition, all appropriate running equipment tripped due to load shedding. Reactor pressure was 787 psig at the time of the event and no pressure transient or vessel injection occurred. All equipment responded to the actuation as expected for plant conditions. The excess flow check valve testing was stopped and the reactor vessel pressure test was terminated as a result of this invalid actuation.</br>It was subsequently determined that a leaking drain valve at the instrument rack where the excess flow check valve testing was being performed caused a slow depressurization of the high-pressure side sensing line for the level transmitters associated with ATWS Channel A and the A and C channels for ECCS, resulting in an erroneous level signal and the invalid actuation. The instrument rack drain valve is scheduled for replacement.</br>The NRC Resident Inspector was notified. The NRC Resident Inspector was notified  +
20:15:00, 15 April 2005  +
41,770  +
13:45:00, 14 June 2005  +
20:15:00, 15 April 2005  +
At 1515 hours on April 15, 2005, while conAt 1515 hours on April 15, 2005, while conducting excess flow check valve testing in conjunction with a reactor vessel pressure test during a scheduled refueling outage, Unit 1 received an invalid Anticipated Transient Without Scram (ATWS) Channel A trip signal and invalid reactor Lo-Lo water level trips on the A and C channels for ECCS. The operating Reactor Recirculation pump (1 A) tripped and both Emergency Diesel Generators (Unit 1 and Unit 0) auto-started and ran unloaded. RCIC received an initiation signal, which resulted in proper valve repositioning for the system but no injection due to the steam supply being isolated to support the reactor vessel pressure test. In addition, all appropriate running equipment tripped due to load shedding. Reactor pressure was 787 psig at the time of the event and no pressure transient or vessel injection occurred. All equipment responded to the actuation as expected for plant conditions. The excess flow check valve testing was stopped and the reactor vessel pressure test was terminated as a result of this invalid actuation.</br>It was subsequently determined that a leaking drain valve at the instrument rack where the excess flow check valve testing was being performed caused a slow depressurization of the high-pressure side sensing line for the level transmitters associated with ATWS Channel A and the A and C channels for ECCS, resulting in an erroneous level signal and the invalid actuation. The instrument rack drain valve is scheduled for replacement.</br>The NRC Resident Inspector was notified. The NRC Resident Inspector was notified  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
0.0175 d (0.421 hours, 0.0025 weeks, 5.764575e-4 months)  +
00:00:00, 14 June 2005  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:40:45, 24 September 2017  +
13:45:00, 14 June 2005  +
false  +
false  +
59.729 d (1,433.5 hours, 8.533 weeks, 1.964 months)  +
20:15:00, 15 April 2005  +
Invalid Actuation During Excess Flow Check Valve Testing  +