On 10/08/04 on Unit Two, the HPCI Valve OpOn 10/08/04 on Unit Two, the HPCI Valve Operability was being performed. During the course of this evolution the suction path was transferred from the Condensate Storage Tank (CST) to the Suppression Pool. When the HPCI System was aligned to the Suppression Pool the Suction Pressure decreased from 25.5 psig to 1.5 psig. With HPCI aligned to the suppression pool and with suction pressure less than 14 psig the HPCI System was declared INOPERABLE.</br>Investigation continues as to the cause of the low suction pressure. Preliminarily it is suspected that the Suppression Pool suction path was not adequately filled and vented following a recent tag out of that suction path for maintenance inspection activities. Investigation continues.</br>The Licensee notified the NRC Resident Inspector.</br>* * * RETRACTION FROM DISMUKE TO CROUCH AT 1521 EDT ON 10/28/04 * * *</br>The following information was obtained from the licensee via facsimile:</br>The Unit 2 HPCI system was considered inoperable, since the technical information that would conclusively support its continued operability given the condition encountered could not be assembled within the time constraints of the reporting requirements. Subsequent to the event the system was confirmed be properly filled and vented with a negligible amount of air vented in the process. It was determined that this small amount of air was introduced to the suction piping as a result of an inspection activity performed for the HPCI suction check valve prior to the event. A limited amount of air remained in the torus suction piping causing the decrease in suction experienced during the event. Engineering reviewed the implications of the low suction pressure on the ability of the HPCI system to perform its safety function given the design of the system and the suction sources available. In each case Engineering was able to conclusively determine that the HPCI system would not have tripped due to low suction pressure had it received an automatic initiation signal and was actually operable during the time frame that Operations had conservatively treated the system as inoperable. Additionally, the effect of the trapped air being entrained in the pump suction was also analyzed, and the conclusion reached was that the air would not have prevented the pump's proper performance. Based on this information, the event reported on 10/08/2004 is not reportable.</br>The licensee has notified the NRC Resident Inspector.</br>The Headquarters Operations Officer notified R2DO (Bonser).Operations Officer notified R2DO (Bonser).  
05:50:00, 8 October 2004  +
41,103  +
09:13:00, 8 October 2004  +
05:50:00, 8 October 2004  +
On 10/08/04 on Unit Two, the HPCI Valve OpOn 10/08/04 on Unit Two, the HPCI Valve Operability was being performed. During the course of this evolution the suction path was transferred from the Condensate Storage Tank (CST) to the Suppression Pool. When the HPCI System was aligned to the Suppression Pool the Suction Pressure decreased from 25.5 psig to 1.5 psig. With HPCI aligned to the suppression pool and with suction pressure less than 14 psig the HPCI System was declared INOPERABLE.</br>Investigation continues as to the cause of the low suction pressure. Preliminarily it is suspected that the Suppression Pool suction path was not adequately filled and vented following a recent tag out of that suction path for maintenance inspection activities. Investigation continues.</br>The Licensee notified the NRC Resident Inspector.</br>* * * RETRACTION FROM DISMUKE TO CROUCH AT 1521 EDT ON 10/28/04 * * *</br>The following information was obtained from the licensee via facsimile:</br>The Unit 2 HPCI system was considered inoperable, since the technical information that would conclusively support its continued operability given the condition encountered could not be assembled within the time constraints of the reporting requirements. Subsequent to the event the system was confirmed be properly filled and vented with a negligible amount of air vented in the process. It was determined that this small amount of air was introduced to the suction piping as a result of an inspection activity performed for the HPCI suction check valve prior to the event. A limited amount of air remained in the torus suction piping causing the decrease in suction experienced during the event. Engineering reviewed the implications of the low suction pressure on the ability of the HPCI system to perform its safety function given the design of the system and the suction sources available. In each case Engineering was able to conclusively determine that the HPCI system would not have tripped due to low suction pressure had it received an automatic initiation signal and was actually operable during the time frame that Operations had conservatively treated the system as inoperable. Additionally, the effect of the trapped air being entrained in the pump suction was also analyzed, and the conclusion reached was that the air would not have prevented the pump's proper performance. Based on this information, the event reported on 10/08/2004 is not reportable.</br>The licensee has notified the NRC Resident Inspector.</br>The Headquarters Operations Officer notified R2DO (Bonser).Operations Officer notified R2DO (Bonser).  
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 28 October 2004  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:42:14, 24 September 2017  +
09:13:00, 8 October 2004  +
false  +
0.141 d (3.38 hours, 0.0201 weeks, 0.00463 months)  +
true  +
05:50:00, 8 October 2004  +
High Pressure Coolant Injection (Hpci) System Declared Inoperable  +