Browse wiki
Jump to navigation
Jump to search
The following information was provided by … The following information was provided by the licensee via phone and email:</br>(Oregon State University Radiation Center is) providing this information as a follow-up with the phone call to the Headquarters Operations Center made today at 1325 EDT (EN-56579). On the morning of 5/31/2023, a senior reactor operator and a trainee operator were performing a square-wave operation to raise power from 100 W to 1 MW. After firing the transient rod, the reactor immediately scrammed on both safety and percent power channels. Review of the chart recorder shows that reactor power likely reached 1.45 MW. This is potentially a violation of Technical Specification 3.1.1 which limits power to 1.1 MW during steady-state operations.</br>Reviewing the power chart recorder, it appears that two immediately adjacent steps required for the square-wave operation were performed inadvertently out of order. The chart's sample rate is 1 Hz, so the resolution on the data is limited. Within 10 seconds, the final procedure steps for square-wave operation were performed (with the mode switch in square-wave mode). Once the transient rod air actuation button was pushed, starting the square-wave, the safety channel shortly thereafter (approximately 1 second) went from 0.02 percent to 145.91 percent of 1 MW. The reactor immediately scrammed and shut down the reactor as the safety and percent power channels exceeded their scram setpoints of 106 percent of 1 MW, which were checked on the daily startup checklist. The cause of the event was that two steps in the procedure were performed out of order, causing the regulating rod to withdraw to match demand power as the transient rod withdrew. As a result, this caused an additional 18 cents of reactivity to be inserted above the planned reactivity insertion of 80 cents.</br>(Oregon State University Radiation Center plans) on following this up with a more thorough report within 14 days.ith a more thorough report within 14 days. +
16:30:00, 31 May 2023 +
56,579 +
13:25:00, 16 June 2023 +
16:30:00, 31 May 2023 +
The following information was provided by … The following information was provided by the licensee via phone and email:</br>(Oregon State University Radiation Center is) providing this information as a follow-up with the phone call to the Headquarters Operations Center made today at 1325 EDT (EN-56579). On the morning of 5/31/2023, a senior reactor operator and a trainee operator were performing a square-wave operation to raise power from 100 W to 1 MW. After firing the transient rod, the reactor immediately scrammed on both safety and percent power channels. Review of the chart recorder shows that reactor power likely reached 1.45 MW. This is potentially a violation of Technical Specification 3.1.1 which limits power to 1.1 MW during steady-state operations.</br>Reviewing the power chart recorder, it appears that two immediately adjacent steps required for the square-wave operation were performed inadvertently out of order. The chart's sample rate is 1 Hz, so the resolution on the data is limited. Within 10 seconds, the final procedure steps for square-wave operation were performed (with the mode switch in square-wave mode). Once the transient rod air actuation button was pushed, starting the square-wave, the safety channel shortly thereafter (approximately 1 second) went from 0.02 percent to 145.91 percent of 1 MW. The reactor immediately scrammed and shut down the reactor as the safety and percent power channels exceeded their scram setpoints of 106 percent of 1 MW, which were checked on the daily startup checklist. The cause of the event was that two steps in the procedure were performed out of order, causing the regulating rod to withdraw to match demand power as the transient rod withdrew. As a result, this caused an additional 18 cents of reactivity to be inserted above the planned reactivity insertion of 80 cents.</br>(Oregon State University Radiation Center plans) on following this up with a more thorough report within 14 days.ith a more thorough report within 14 days. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 16 June 2023 +
R-106 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
11:30:14, 20 June 2023 +
13:25:00, 16 June 2023 +
15.872 d (380.92 hours, 2.267 weeks, 0.522 months) +
16:30:00, 31 May 2023 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.