Browse wiki

Jump to navigation Jump to search
The following information was provided by The following information was provided by United Controls International via email:</br>Schneider Electric part number: ASP840-000 Modicon Primary/Secondary Power Supply units failed to operate several days after installation at Dominion's Surry Power Station with hard failures that shutdown the associated programable logic controller. The units were returned to UCI and initial observations indicated heavy shipping damage that was not present when initially supplied. Further evaluation of the damaged components requires manufacturer evaluation due to item complexity and proprietary design documentation. Investigation into the root cause(s) of the failures is ongoing. Evaluation of whether these failures represent deviations or failures to comply that would be associated with substantial safety hazards will be complete by July 2, 2023.</br>For questions concerning this potential 10 CFR 21 issue, please contact:</br>Anu Kulkarni</br>Quality Assurance Manager</br>United Controls International</br>(470) 610-0851ited Controls International (470) 610-0851  +
05:00:00, 7 September 2022  +
56,388  +
11:08:00, 3 March 2023  +
05:00:00, 7 September 2022  +
The following information was provided by The following information was provided by United Controls International via email:</br>Schneider Electric part number: ASP840-000 Modicon Primary/Secondary Power Supply units failed to operate several days after installation at Dominion's Surry Power Station with hard failures that shutdown the associated programable logic controller. The units were returned to UCI and initial observations indicated heavy shipping damage that was not present when initially supplied. Further evaluation of the damaged components requires manufacturer evaluation due to item complexity and proprietary design documentation. Investigation into the root cause(s) of the failures is ongoing. Evaluation of whether these failures represent deviations or failures to comply that would be associated with substantial safety hazards will be complete by July 2, 2023.</br>For questions concerning this potential 10 CFR 21 issue, please contact:</br>Anu Kulkarni</br>Quality Assurance Manager</br>United Controls International</br>(470) 610-0851ited Controls International (470) 610-0851  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 3 March 2023  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
23:34:27, 7 March 2023  +
11:08:00, 3 March 2023  +
177.214 d (4,253.13 hours, 25.316 weeks, 5.826 months)  +
05:00:00, 7 September 2022  +
Part 21 - Deviation to Qualified Design  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.