The following information was received via … The following information was received via email:</br>On July 29, 2019, at 1903 CDT, the University of Missouri-Columbia Research Reactor (MURR) was shut down due to a failure of the regulating blade drive mechanism during reactor operation. This email is a required notification per MURR Technical Specification (TS) 6.6.c(1) to report to the NRC Operations Center that an Abnormal Occurrence, as defined by TS 1.1, had occurred. MURR was not in compliance with all Limiting Conditions for Operations (LCOs), specifically TS 3.2.a, which states, 'All control blades, including the regulating blade, shall be operable during reactor operation.' The regulating blade drive mechanism was removed, repaired, reinstalled, and all its functions were tested satisfactorily. Permission from the Reactor Facility Director was obtained per TS 6.6.c(4) prior to starting up the reactor later on July 29. Currently, MURR is at 10 MW.</br>A detailed event report will follow within 14 days as required by TS 6.6.c(3).</br>The licensee has notified the NRC Research and Test Reactor Project Manager.Research and Test Reactor Project Manager. +
00:03:00, 30 July 2019 +
54,187 +
13:47:00, 30 July 2019 +
00:03:00, 30 July 2019 +
The following information was received via … The following information was received via email:</br>On July 29, 2019, at 1903 CDT, the University of Missouri-Columbia Research Reactor (MURR) was shut down due to a failure of the regulating blade drive mechanism during reactor operation. This email is a required notification per MURR Technical Specification (TS) 6.6.c(1) to report to the NRC Operations Center that an Abnormal Occurrence, as defined by TS 1.1, had occurred. MURR was not in compliance with all Limiting Conditions for Operations (LCOs), specifically TS 3.2.a, which states, 'All control blades, including the regulating blade, shall be operable during reactor operation.' The regulating blade drive mechanism was removed, repaired, reinstalled, and all its functions were tested satisfactorily. Permission from the Reactor Facility Director was obtained per TS 6.6.c(4) prior to starting up the reactor later on July 29. Currently, MURR is at 10 MW.</br>A detailed event report will follow within 14 days as required by TS 6.6.c(3).</br>The licensee has notified the NRC Research and Test Reactor Project Manager.Research and Test Reactor Project Manager. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 30 July 2019 +
R-103 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
11:30:09, 31 July 2019 +
13:47:00, 30 July 2019 +
Processing error"Processing error" is a predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> and represents errors that appeared in connection with improper value annotations or input processing.
0.572 d (13.73 hours, 0.0817 weeks, 0.0188 months) +
00:03:00, 30 July 2019 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.