Browse wiki
Jump to navigation
Jump to search
100 +
On January 11, 2018, at 1041 EST, a planne … On January 11, 2018, at 1041 EST, a planned train swap of the Reactor Building Heating Ventilation and Air Conditioning (RBHVAC) system resulted in the Technical Specification (TS) for secondary containment pressure boundary not being met for less than one minute. The maximum secondary containment pressure observed during that time was approximately 0.117 inches of vacuum water gauge.</br>Secondary containment pressure was returned to within the TS operability limit of greater than or equal to 0.125 inches of vacuum water gauge per TS Surveillance Requirement (SR) 3.6.4.1.1 by starting Division 1 of the Standby Gas Treatment System (SGTS) in addition to the RBHVAC system already in operation. Secondary containment pressure is currently stable. Secondary containment was declared Operable at 1045 EST. There were no radiological releases associated with this event.</br>Declaring secondary containment inoperable as a result of not meeting TS SR 3.6.4.1.1 is reportable under 10CFR 50.72(b)(3)(v)(C) as an event or condition that could have prevented the fulfillment of a safety function needed to control the release of radioactive material.</br>The licensee has notified the NRC Resident Inspector.e has notified the NRC Resident Inspector. +
15:41:00, 11 January 2018 +
53,165 +
16:06:00, 11 January 2018 +
15:41:00, 11 January 2018 +
On January 11, 2018, at 1041 EST, a planne … On January 11, 2018, at 1041 EST, a planned train swap of the Reactor Building Heating Ventilation and Air Conditioning (RBHVAC) system resulted in the Technical Specification (TS) for secondary containment pressure boundary not being met for less than one minute. The maximum secondary containment pressure observed during that time was approximately 0.117 inches of vacuum water gauge.</br>Secondary containment pressure was returned to within the TS operability limit of greater than or equal to 0.125 inches of vacuum water gauge per TS Surveillance Requirement (SR) 3.6.4.1.1 by starting Division 1 of the Standby Gas Treatment System (SGTS) in addition to the RBHVAC system already in operation. Secondary containment pressure is currently stable. Secondary containment was declared Operable at 1045 EST. There were no radiological releases associated with this event.</br>Declaring secondary containment inoperable as a result of not meeting TS SR 3.6.4.1.1 is reportable under 10CFR 50.72(b)(3)(v)(C) as an event or condition that could have prevented the fulfillment of a safety function needed to control the release of radioactive material.</br>The licensee has notified the NRC Resident Inspector.e has notified the NRC Resident Inspector. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100 +
00:00:00, 11 January 2018 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
12:30:06, 12 January 2018 +
16:06:00, 11 January 2018 +
true +
false +
0.0175 d (0.42 hours, 0.0025 weeks, 5.75316e-4 months) +
15:41:00, 11 January 2018 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.