On May 23, 2017 at 2330, while transferrin … On May 23, 2017 at 2330, while transferring 2A-A 6.9 kV Shutdown Board from its alternate power source to its normal power source in support of outage testing, a failure occurred which resulted in the loss of the Shutdown Board, emergency start of all 4 Emergency Diesel Generators (EDGs), and required the manual emergency stop of 2A-A EDG.</br>During transfer of the 2A-A 6.9kV Shutdown Board, the hand switch for the normal feeder breaker on the shutdown board was being maintained in the 'CLOSE' position while the alternate feeder breaker hand switch was placed in 'TRIP.' As expected, the alternate feeder breaker opened and the normal feeder breaker closed. However, the upstream supply breaker to the normal feeder breaker immediately tripped due to an overcurrent relay actuation on a single phase. As a result, the 2A-A 6.9 kV Shutdown Board deenergized, initiating a blackout signal which started all 4 of the station's EDGs. During board stripping (opening of all feeder and load breakers, to prepare the board for automatic reenergization from the EDG), the normal feeder breaker to the Shutdown Board failed to trip. This failure to trip prevented the emergency feeder breaker in the output of 2A-A EDG from closing, in accordance with interlock logic. As a result, 2A-A 6.9 kV Shutdown Board remained deenergized which prevented the cooling water supply valve for the EDG from opening due to loss of motive power. This lack of cooling caused operators to emergency stop the 2A-A EDG. </br>Power was restored to the Shutdown Board on May 24, 2017 at 0037.</br>Unit 1 is currently stable in Mode 1, at 100% power and Unit 2 is stable in Mode 5 with RCS at 164 F and 340 psig.</br>The cause of the breaker trip on overcurrent and the failure of the normal feeder to trip on load shedding are under investigation.</br>This event had no impact on the health and/or safety of the public. The NRC Resident Inspector has been notified. NRC Resident Inspector has been notified. +
03:30:00, 24 May 2017 +
52,769 +
04:10:00, 24 May 2017 +
03:30:00, 24 May 2017 +
On May 23, 2017 at 2330, while transferrin … On May 23, 2017 at 2330, while transferring 2A-A 6.9 kV Shutdown Board from its alternate power source to its normal power source in support of outage testing, a failure occurred which resulted in the loss of the Shutdown Board, emergency start of all 4 Emergency Diesel Generators (EDGs), and required the manual emergency stop of 2A-A EDG.</br>During transfer of the 2A-A 6.9kV Shutdown Board, the hand switch for the normal feeder breaker on the shutdown board was being maintained in the 'CLOSE' position while the alternate feeder breaker hand switch was placed in 'TRIP.' As expected, the alternate feeder breaker opened and the normal feeder breaker closed. However, the upstream supply breaker to the normal feeder breaker immediately tripped due to an overcurrent relay actuation on a single phase. As a result, the 2A-A 6.9 kV Shutdown Board deenergized, initiating a blackout signal which started all 4 of the station's EDGs. During board stripping (opening of all feeder and load breakers, to prepare the board for automatic reenergization from the EDG), the normal feeder breaker to the Shutdown Board failed to trip. This failure to trip prevented the emergency feeder breaker in the output of 2A-A EDG from closing, in accordance with interlock logic. As a result, 2A-A 6.9 kV Shutdown Board remained deenergized which prevented the cooling water supply valve for the EDG from opening due to loss of motive power. This lack of cooling caused operators to emergency stop the 2A-A EDG. </br>Power was restored to the Shutdown Board on May 24, 2017 at 0037.</br>Unit 1 is currently stable in Mode 1, at 100% power and Unit 2 is stable in Mode 5 with RCS at 164 F and 340 psig.</br>The cause of the breaker trip on overcurrent and the failure of the normal feeder to trip on load shedding are under investigation.</br>This event had no impact on the health and/or safety of the public. The NRC Resident Inspector has been notified. NRC Resident Inspector has been notified. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 24 May 2017 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
01:42:37, 2 March 2018 +
04:10:00, 24 May 2017 +
false +
0.0279 d (0.67 hours, 0.00399 weeks, 9.17766e-4 months) +
03:30:00, 24 May 2017 +
All Four Edgs Autostarted During Transfer of Shutdown Board to Normal Power Source for Unit 2 Testing +