On 1/17/17 at 2130 CST, the MURR (UniversiOn 1/17/17 at 2130 CST, the MURR (University of Missouri Research Reactor) was shut down due to the failure of the regulating blade to move. This email is a required notification per MURR TS 6.6.c.(1) to report to the NRC Operations Center that an Abnormal Occurrence as defined by MURR TS 1.1 happened. Specifically, MURR was not in compliance with all Limiting Conditions for Operations (LCOs). MURR was not in compliance with the LCO TS 3.2.a. which states, 'All control blades, including the regulating blade, shall be operable during reactor operation.' The regulating blade was repaired, and the required compliance procedure was conducted on the regulating blade prior to the reactor being started up on 1/18/17. Currently, MURR is again at 10 MW. A detailed event report will follow within 14 days as required by MURR TS 6.6.c.(3).</br>The reactor was at 10 MW power when this event occurred. The cause of this event is under investigation.</br>The licensee notified the NRC RTR Project Manager.nsee notified the NRC RTR Project Manager.  +
03:30:00, 18 January 2017  +
52,495  +
10:04:00, 18 January 2017  +
03:30:00, 18 January 2017  +
On 1/17/17 at 2130 CST, the MURR (UniversiOn 1/17/17 at 2130 CST, the MURR (University of Missouri Research Reactor) was shut down due to the failure of the regulating blade to move. This email is a required notification per MURR TS 6.6.c.(1) to report to the NRC Operations Center that an Abnormal Occurrence as defined by MURR TS 1.1 happened. Specifically, MURR was not in compliance with all Limiting Conditions for Operations (LCOs). MURR was not in compliance with the LCO TS 3.2.a. which states, 'All control blades, including the regulating blade, shall be operable during reactor operation.' The regulating blade was repaired, and the required compliance procedure was conducted on the regulating blade prior to the reactor being started up on 1/18/17. Currently, MURR is again at 10 MW. A detailed event report will follow within 14 days as required by MURR TS 6.6.c.(3).</br>The reactor was at 10 MW power when this event occurred. The cause of this event is under investigation.</br>The licensee notified the NRC RTR Project Manager.nsee notified the NRC RTR Project Manager.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 18 January 2017  +
R-103  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
01:41:49, 2 March 2018  +
10:04:00, 18 January 2017  +
0.274 d (6.57 hours, 0.0391 weeks, 0.009 months)  +
03:30:00, 18 January 2017  +
Failure of the Regulating Blade to Move  +