On 11/8/16, Operators were performing Divi … On 11/8/16, Operators were performing Division I Undervoltage Testing Surveillance on Unit 3, when a 2 (psi) drywell signal was inserted, Reactor Building Ventilation tripped and SBGT initiated as expected. At 0510 (CST), reactor building to atmosphere differential pressure dropped below the (negative) 0.25 inches water. This condition represents a failure to meet Surveillance Requirement 3.6.4.1.1. As a result, entry into Technical Specification 3.6.4.1 condition A was made due to Secondary Containment becoming inoperable. This event is being reported in accordance with 10CFR 50.72(b)(3)(v)(C) as a condition that could have prevented the fulfillment of a safety function. At 0532, the 2/3 Reactor Building material interlock inner door was closed and Reactor Building (differential pressure) was restored to greater than (negative).25 inches of water column. An issue report has been initiated. An investigation will be conducted and a 60 day Licensee Event report will be submitted in accordance with 10 CFR 50.73(a)(2)(v)(C).</br>The NRC Resident Inspector has been notified. NRC Resident Inspector has been notified. +
11:10:00, 8 November 2016 +
52,355 +
12:50:00, 8 November 2016 +
11:10:00, 8 November 2016 +
On 11/8/16, Operators were performing Divi … On 11/8/16, Operators were performing Division I Undervoltage Testing Surveillance on Unit 3, when a 2 (psi) drywell signal was inserted, Reactor Building Ventilation tripped and SBGT initiated as expected. At 0510 (CST), reactor building to atmosphere differential pressure dropped below the (negative) 0.25 inches water. This condition represents a failure to meet Surveillance Requirement 3.6.4.1.1. As a result, entry into Technical Specification 3.6.4.1 condition A was made due to Secondary Containment becoming inoperable. This event is being reported in accordance with 10CFR 50.72(b)(3)(v)(C) as a condition that could have prevented the fulfillment of a safety function. At 0532, the 2/3 Reactor Building material interlock inner door was closed and Reactor Building (differential pressure) was restored to greater than (negative).25 inches of water column. An issue report has been initiated. An investigation will be conducted and a 60 day Licensee Event report will be submitted in accordance with 10 CFR 50.73(a)(2)(v)(C).</br>The NRC Resident Inspector has been notified. NRC Resident Inspector has been notified. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 8 November 2016 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
01:43:52, 2 March 2018 +
12:50:00, 8 November 2016 +
false +
0.0696 d (1.67 hours, 0.00994 weeks, 0.00229 months) +
11:10:00, 8 November 2016 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.