At 1359 CDT on April 22, 2016, Browns FerrAt 1359 CDT on April 22, 2016, Browns Ferry Units 1 & 2 experienced a partial loss of power during the transfer of Shutdown Bus 2 from the alternate power source back to the normal power source. During the transfer, the normal feeder breaker failed to close and provide power to the Shutdown Bus, resulting in an auto actuation of two Emergency Diesel Generators (EDGs). Power to Shutdown Bus 2 was immediately restored using the alternate feeder breaker. The EDGs did not tie to the boards.</br>All systems responded as expected for the loss of power, and both Units 1 & 2 maintained 100% Rx Power. All systems have been restored to a normal lineup, and both Units 1 & 2 remain at 100% Rx Power.</br>This event requires an 8 hour report per 10 CFR 50.72(b)(3)(iv)(A), 'Any event or condition that results in valid actuation of any of the systems listed in paragraph (b)(3)(iv)(B), (8) Emergency AC electrical power systems, including: Emergency diesel generators (EDGs).'</br>The NRC resident inspector has been notified.</br>The cause of the normal feeder breaker failure is being investigated. There was no impact on Unit 3.is being investigated. There was no impact on Unit 3.  +
18:59:00, 22 April 2016  +
51,878  +
18:22:00, 22 April 2016  +
18:59:00, 22 April 2016  +
At 1359 CDT on April 22, 2016, Browns FerrAt 1359 CDT on April 22, 2016, Browns Ferry Units 1 & 2 experienced a partial loss of power during the transfer of Shutdown Bus 2 from the alternate power source back to the normal power source. During the transfer, the normal feeder breaker failed to close and provide power to the Shutdown Bus, resulting in an auto actuation of two Emergency Diesel Generators (EDGs). Power to Shutdown Bus 2 was immediately restored using the alternate feeder breaker. The EDGs did not tie to the boards.</br>All systems responded as expected for the loss of power, and both Units 1 & 2 maintained 100% Rx Power. All systems have been restored to a normal lineup, and both Units 1 & 2 remain at 100% Rx Power.</br>This event requires an 8 hour report per 10 CFR 50.72(b)(3)(iv)(A), 'Any event or condition that results in valid actuation of any of the systems listed in paragraph (b)(3)(iv)(B), (8) Emergency AC electrical power systems, including: Emergency diesel generators (EDGs).'</br>The NRC resident inspector has been notified.</br>The cause of the normal feeder breaker failure is being investigated. There was no impact on Unit 3.is being investigated. There was no impact on Unit 3.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
9.259259e-5 d (0.00222 hours, 1.322751e-5 weeks, 3.044e-6 months)  +
100  +
00:00:00, 22 April 2016  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
01:45:17, 2 March 2018  +
18:22:00, 22 April 2016  +
false  +
-0.0258 d (-0.62 hours, -0.00369 weeks, -8.49276e-4 months)  +
18:59:00, 22 April 2016  +
Partial Loss of Power Experienced During Electrical Bus Transfer  +